Line 5 Straits New Anchor Structures

 Public Statement

Michigan Department of Environmental Quality

Line 5 Straits New Anchor Structures

Jim Olson

President and Legal Advisor, FLOW (For Love of Water)

July 25, 2017


Director Grether, Division and Unit Chief Fisher, and the Gaylord Office Unit Supervisor Haas, and Great Lakes Submerged Land Specialist Graft:

This statement addresses a primary legal requirement for Enbridge concerning its proposal to locate, occupy, and engage in construction activity for twenty-two (22) new anchor supports on the public trust bottomlands and waters of Lake Michigan. The application as filed requests an activities permit pursuant to the Great Lakes Submerged Lands Act and Rules (“GLSA”) for placement of these twenty-two anchors as “other materials.”  As will be seen, these anchors and the pipeline are new and involve far more than placing spoils or other materials as an activities permit. In fact, these anchor supports and line, in combination with the dual lines in the Straits, have never been authorized under the GLSA and public trust law.

FLOW submitted public comments into the record on this application on June 29, 2017, and will submit supplemental public comments and technical reports on or before August 4, 2017, the end of the extended public comment period.  For purposes of the public hearing I offer the following specific comment on the legal framework for the proceedings under the GLSA for these twenty-two support anchors and the dual pipelines in the Straits of Mackinac.

First, the history of these new anchor supports, including the proposed twenty-two supports for the dual pipelines is directly related to the failure in design and construction of the original pipelines as authorized by the terms of the 1953 Easement and the substantial increase in crude oil flow rate from 300,000 bpd approved by the Public Service Commission in 1953 and the very new increase to 540,000 bpd as part of Enbridge’s project to expand its Lakeside System. A more detailed description of these anchors and why they are new and need approval to operate these dual lines are contained in FLOW’s June 29 public comment as supplemented by the comments to be filed on or before August 4, including the additional supplemental that will be submitted by technical experts Ed Timm and Gary Street.

Second, these anchor supports are new because they fall outside and were not authorized as part of the pipelines by the 1953 Easement. These anchors are new because they are proposed to prevent further bending in the compromised and deformed lines because of powerful currents and other forces in the Straits. As noted, they are also new because these supports together with other new facilities and equipment along Line 5 are part of the Enbridge expansion of its entire Lakehead System, including the doubling of Line 6b (now Line 78) to Stockbridge in southern Michigan.

In lay person terms, what does this mean?  It means that the dual pipelines with these new anchor supports and increased flow volume have not been authorized by agreements to permit the occupancy of these anchor supports on the bottomlands and n the waters of the Great Lakes as required by the GLSLA and its Rules. It means that the pending application for the proposed new twenty-two new supports does not comply with the requirements under the GLSLA and its Rules for a proper agreement or authorization for occupying bottomlands and waters in the Straits.

New structures to prop up a previously authorized line based on the existing define and new and increased volumes as part of a major single expansion project require new authorization. It is as simple as that.  Before the Department can act on Enbridge’s application for the construction activity permit for the anchor supports, Enbridge must first apply for and the State must authorize an occupancy conveyance or agreement in accordance with Sections 32502, 32503, and 32505 and other parts of the GLSLA and its Rules.

What to do, then?  The most straightforward way to proceed is for the MDEQ to notify Enbridge that it must comply with the requirements for authorization to occupy as I have described above, and to cease or halt the use of the lines in the Straits unless and until these lines with these new anchor supports have been applied for and determined to satisfy the standards and requirements of the GLSLA and its Rules. Recent evidence from Enbridge records and grueling evaluation by Dr. Ed Timm demonstrate that the integrity of the pipelines, as noted above has been precariously compromised, and as a result, according to Dr. Timm, there is in 2017 a probability of a failure in one of the lines as high as forty-six percent (46%).

The only prudent and correct thing for the State to do to prevent impairment or injury to the public trust and public and private riparian rights, public health, and safety, is to halt the flow of oil and put the onus on Enbridge to apply for proper conveyance authorization for these new structures in conjunction with these pipelines—they are inextricably related. Enbridge can decide to apply for these new supports in conjunction with the condition of the pipelines and the eighty percent (80%) increase in flow of crude oil.  The State DEQ can now once and for all finally consider and determine as trustee of the public trust protected by the GLSLA, whether Enbridge has shown there is no likely high risk of serious impairment to the public trust interests of Michigan and its citizens.

To date, not one agency has considered the environmental impact or existence of other alternatives related to the increase in flow of crude oil, the new supports and the condition of these lines.  The State can now evaluate in an orderly legal process whether the dual lines in the Straits can be or should be authorized. If Enbridge does not apply in order to comply and demonstrate a right to authorization and approval, then that is its own choice, and the State has the power, duty, and right to halt the transport of crude oil or demand decommissioning of the dual lines because they do not comply with state law and regulations enacted under its title and police power to protect its public trust lands and waters.

Thank you.


 

A Disappointing Distraction: FLOW’s Statement on the Line 5 Alternatives Study

On June 29, the State of Michigan released for public comment a consultant’s study on alternatives to Line 5, the risky 64-year-old dual oil pipelines that cross the lakebed of the Straits of Mackinac.  The state is now holding public meetings on the study.

The study is a major disappointment and contributes little of value to the discussion on the fate of the oil pipelines operating in the Great Lakes since 1953. 

FLOW’s position is unchanged:  the State of Michigan must terminate the easement allowing Enbridge to use Lake Michigan’s lakebed for the pipelines.  The state has the authority and the responsibility to do so to prevent a catastrophic oil spill.  In light of Enbridge’s consistent record of disregard for maintenance of Line 5, the state must do so.

* FLOW rejects the alternatives study as fatally tainted by the authors’ blatant conflict of interest. The consulting firm’s vice president has an extensive history of working alongside of, and in support of, Enbridge.  The state’s process is now revealed for what it always has been – a distraction from its responsibility to protect the Great Lakes by shutting down Line 5 now.

* Substantively, the alternatives study can’t be taken seriously because it:

  1. Completely ignores the most suitable alternative to Line 5, which is existing infrastructure. The state asked consultant Dynamic Risk to analyze it. Failure to do so skews the analysis. Since the state and consultant won’t do their jobs and analyze the existing infrastructure, FLOW will continue to analyze it by updating our 2015 independent expert report on that alternative in the near future.
  2. Assumes the best-case scenario for a spill. The consultant uses assumptions of risk that are woefully inadequate and are not credible. It estimates that:
  • Only 20 miles of shoreline would be impacted by a spill. This is just 3% of the 720-mile area the University of Michigan found vulnerable to a spill in its 2016 study.
  • An oil spill would cost $100 million to $200 million, when Enbridge’s cleanup costs for its Line 6B pipeline oil spill into the Kalamazoo River watershed in 2010 cost more than $1.2 billion.
  1. Inflates the impact of shutting down Line 5 to the U.P.’s propane supply. The report estimates an impact to propane supply much greater than what FLOW’s independent experts have determined would be necessary to provide the Upper Peninsula’s Rapid River facility with an alternative supply. The flawed report finds that up to 35 railcars per week or 15 truckloads per day would be necessary to replace the Line 5 supply of natural gas liquids, while FLOW’s expert studies have found it would take only one railcar or 3 – 4 truckloads per day.

FLOW is a leader in the Oil & Water Don’t Mix campaign uniting citizens, businesses, groups, governments, tribes, and faith communities in support of shutting down Line 5 to avoid a catastrophic Great Lakes oil spill.

Please submit your comments on the State of Michigan’s Line 5 alternatives study by August 4 by visiting the Oil & Water Don’t Mix website here: www.OilandWaterDontMix.org.

 

 

 

 

 

 

Enbridge’s Neglect of 64-Year-Old “Line 5” Pipelines Risks Mackinac Straits, Requires State to Stop Oil and Hold Hearings


 


 


 

FOR IMMEDIATE RELEASE TO MEDIA: June 29, 2017

Contacts:

Liz Kirkwood, Executive Director                                                  Cell: 570-872-4956
FLOW (For Love of Water)                                                          Email: liz@flowforwater.org

Jim Olson, Founder & President                                                   Cell: 231-499-8831
FLOW (For Love of Water)                                                          Email: olson@envlaw.com 

 

TRAVERSE CITY –

After the revelation earlier this month that Enbridge for years routinely violated a legal agreement to properly anchor its dual pipelines against the swift currents in the Mackinac Straits, the state of Michigan now must apply the law, stop Line 5’s oil flow, and hold public hearings as it considers the Canadian company’s application to squeeze more life out of its decaying steel infrastructure built in 1953, according to FLOW, a Traverse City-based Great Lakes water law and policy center, in formal comments released today.

While the state’s 1953 easement agreement granting Enbridge conditional occupancy of state bottomlands in the Mackinac Straits allows Enbridge up to 90 days to cure any violations, a 2016 report commissioned by Enbridge shows that the company for years knowingly ignored the erosion problem, which  appears to be unfixable and worsening with time.

“Enbridge’s willful neglect to properly support Line 5 in the Mackinac Straits is a game changer,” said Liz Kirkwood, FLOW’s Executive Director and environmental attorney. “This neglect is a flagrant violation of the company’s privilege to use the bottomlands and waters of the Great Lakes.”

“Leaving the pipeline exposed without support in the currents and forces of the Straits causes metal fatigue and heightens the risk of a spill. There needs to be an investigation of whether a pipeline should be there at all, before considering structural changes to a pipeline that has been compromised by the company’s own actions,” Kirkwood said.

Enbridge’s June 9 “maintenance” application to install up to 22 more pipeline anchors into Lake Michigan’s public bottomlands fails to address a company pattern of violating the easement and avoiding an assessment of Line 5’s impacts and alternatives, while perpetuating the imminent threat to the Great Lakes and the protected public uses that include fishing, commerce, navigation, recreation, and drinking, according to a legal analysis by FLOW.

The Michigan Department of Environmental Quality (MDEQ) is receiving public comment through today on Enbridge’s application, which also is being reviewed by the U.S. Army Corps of Engineers.

“This application is not about anchor supports. It’s about whether Enbridge can expand Line 5 and the new Line 78 from Indiana across lower Michigan to Sarnia,” said Jim Olson, FLOW’s founder and president and a renowned water rights attorney.  “Our cities, villages, and citizens have ended up with Enbridge’s version of the Keystone XL right here in the Great Lakes, and it happened without the public notice, hearings, and independent impact and alternative analyses required by law.”

The application, like many others filed by Enbridge in the last few years, disguises the company’s piecemeal actions that continue to significantly expand oil transport through and around the Great Lakes. Line 5 transports nearly 23 million gallons of oil and natural gas liquids each day through the Mackinac Straits, 80 percent more volume than its past design capacity after several of its so-called “maintenance” upgrades.

The Michigan Pipeline Safety Advisory Board is conducting a parallel review of Line 5 in the Straits, with a draft report on alternatives released today and a risk report that has been stymied by a conflict of interest, but that process is neither under the rule of law nor complies with the Great Lakes Submerged Lands Act (GLSLA) or other state and federal law.

“The advisory board’s review is not legally binding and does not replace the DEQ’s independent obligation to determine whether Line 5 should continue.” Kirkwood said.

Of particular concern is Enbridge’s continued failure to predict and prevent the cumulative impacts on Line 5 of lakebed erosion caused by Straits currents that frequently reverse and can exceed 10 times the flow over Niagara Falls.

“Enbridge’s piecemeal approach to managing washouts and installing adequate support under the Straits crossing of Line 5 has resulted in the line frequently being out of compliance with easement support requirements since the 1970’s,” said Ed Timm, PhD, an engineer advising FLOW. “Washouts are inherently unpredictable and it is likely that damage to the pipe has already occurred because of unsupported spans that were not detected and repaired by Enbridge’s two-year inspection and repair schedule.”

Contrary to assertions by Enbridge, the state taking action to stop Line 5’s oil flow in the Mackinac Straits to prevent a catastrophic oil spill would not disrupt Michigan's or the Midwest's crude oil and propane supply, according to a set of expert reports FLOW released in December 2015. Available capacity and flexibility to meet energy demand in the Great Lakes region already exists in the North American pipeline system run not only by Enbridge, but also by competitors supplying the same refineries in Detroit, Toledo, and Sarnia, Ontario.

“The fact is, Line 5 is not essential,” said Rick Kane, a Michigan-based hazardous materials risk management specialist advising FLOW. “The regional pipeline system can supply crude oil to Michigan and surrounding refineries while eliminating the risk that Line 5 poses to the Great Lakes,” Kane said. “Feasible and prudent alternatives exist to support domestic needs, as well as exports.  However, pipeline company owners will not move to implement any alternatives as long as Line 5 operates and the public continues to carry the risk.”

For more information, visit FLOW’s website at www.FLOWforWater.org/Line-5/ and these links:

  • FLOW’s Public Comments on the Joint Application of Enbridge Energy to Occupy Great Lakes Bottomlands for Anchoring Supports to Transport Crude Oil in Line 5 Pipelines in the Straits of Mackinac and Lake Michigan [2RD-DFDK-Y35G], submitted June 29, 2017.
  • FLOW’s Public Comments on the Joint Application of Enbridge Energy to Occupy Great Lakes Bottomlands for Anchoring Supports to Transport Crude Oil in Line 5 Pipelines in The Straits of Mackinac and Lake Michigan [No. 2hb-Vgko-35je], submitted August 25, 2016.
  • Technical Note Regarding Enbridge Line 5 Non-Compliance with 1953 Easement Requirements, A Mechanistic Analysis of Straits Pipeline Washout Phenomena, by Edward E. Timm, PhD, PE, August 20, 2016.
  • Appendices of August 2016: A & B

 

Enbridge’s June 9, 2017, application and public notice can be viewed at:

  • MDEQ website at https://miwaters.deq.state.mi.us/. The public can view the application or submit comments by clicking on the Public Notice Search and entering “Enbridge” in the Applicant Name section or “2RD-DFDK-Y35G” in the Application Number section.

###

PDF of Media Release:

Read FLOW's Comments here:

Abrupt cancellation of conflict-plagued Line 5 study sparks demand for transparency from DEQ

LANSING – Oil & Water Don’t Mix today said the Michigan Department of Environmental Quality’s decision to cancel a study that was rife with conflicts of interest amplifies the need to shut down the Line 5 pipelines once and for all – and called on state leaders to disclose all details of the draft study that was plagued by conflicts of interest.

“Citizens groups have been sounding the alarm bells for months about the massive conflicts of interest between Big Oil companies and the departments that are charged with regulating them, and this cancellation raises more questions than it answers,” said David Holtz, Chair of Sierra Club Michigan Chapter and Oil & Water Don’t Mix campaign coordinator. “The State of Michigan owes all citizens a full account of how and why this study was allowed to continue, even in light of the massive conflicts of interest. Michiganders deserve answers.”

“This study was tainted by huge conflicts of interest and a complete lack of transparency from the state, all with Line 5 continuing to pose a clear danger to our Great Lakes, our economy, and our way of life,” said Liz Kirkwood, executive director of For Love of Water. “In addition to a full and complete disclosure of the facts regarding this cancellation, we demand that Attorney General Schuette start acting like the lead attorney for the people of Michigan, who elected him to protect us and the Great Lakes, and shut down Line 5 without delay.”

# # #

 

Don’t delay! Submit your public comment today!

 

Click here to read the post on the Michigan Petroleum Pipelines website! 

 

 

Action Alert: Enbridge Trying to Squeeze More Life Out of “Line 5” in the Mackinac Straits

Take Action Now!

Urgent Threat: Enbridge is courting an oil spill disaster again in Michigan, and this time the Great Lakes are at risk. The public has until June 29, 2017, to oppose the Canadian energy transport giant’s request for state permission to squeeze more life out of a cracked, dented, and deformed pair of pipelines that push 23 million gallons of oil a day across the bottom of the Mackinac Straits, where Lake Michigan and Lake Huron meet. The request to continue the piecemeal patch up of the 64-year-old “Line 5” pipelines threatens the drinking water source for more than 40 million people, the economic engine for the Great Lakes region, and a way of life for millions of North Americans.

Terrible Track Record: Recall that Enbridge in 2010 caused the largest inland oil spill in U.S. history when its southern Michigan pipeline ruptured and dumped more than one million gallons of heavy tar sands oil into the Kalamazoo River watershed. That failure sickened 150 people, and permanently drove 150 families from their homes, taking four years and over $1.2 billion to clean up to the extent possible. Enbridge’s Line 5 has a similar dark history, with at least 29 spills totaling more than one million gallons of oil spread along its path in Michigan and Wisconsin since 1953.

Damage Done: Now Enbridge has applied to the State of Michigan for a permit to install more underwater anchor supports on its antiquated Line 5 pipelines in the Mackinac Straits, which the University of Michigan calls the “worst possible place” for a Great Lakes oil spill. The 22 anchor supports are another belated attempt to keep Line 5 from shifting, bending, and grinding on the bottom in the powerful underwater currents at the Straits, but the damage is already done. These supports are merely the latest in a series of stopgap measures that ignore decades of metal fatigue and stress on the pipeline, which is now well past its 50-year life expectancy and should be permanently shut down as soon as possible.

Follow the Facts

Public records reveal that…

  • From the 1970s through the 1990s, Enbridge installed grout bags to prop up Line 5, attempting to meet the state’s requirement under the 1953 easement to support the steel pipeline at least every 75 feet along the publicly owned bottom of the Great Lakes.
  • In 2001, Enbridge declared an emergency on Line 5 in the Straits to stabilize stretches or spans of the pipeline that had become dangerously unsupported for over 130 feet because of “washouts” of the lake bottom and grout bags caused by swift currents that, records show, were underestimated when the pipeline was designed. 
  • Recently it was revealed that Enbridge was out of compliance likely for decades with the legally required safety margin, allowing 16 spans of Line 5 to go unsupported for lengths greater than 140 feet, with the longest being 224 feet on the east pipeline and 286 feet on the west pipeline – nearly four times the legal limit.
  • With no reliable model to predict lakebed washouts due to the highly dynamic nature of currents in the Mackinac Straits, Enbridge cannot meet its legal duty under the state easement to prudently operate this pipeline.
  • Enbridge incorrectly categorizes its proposed patchwork response to Line 5’s major structural defects as “routine maintenance” when the company has, in fact, been systematically expanding the capacity of Line 5 and Line 6b in southern Michigan to carry Canadian oil heading mostly back to Canadian refineries and to overseas markets.

This strategy has previously enabled the company to avoid State of Michigan review of the safety and necessity of the pipeline itself, and dodge the legally required consideration of alternative routes and methods that do not threaten the Great Lakes.

Take Action Now

The public has until June 29, 2017, to submit comments to the Michigan Department of Environmental Quality opposing Enbridge’s bid to keep Line 5 on life support and seeking to prevent a Great Lakes oil spill disaster.

  • Submit comments at http://www.oilandwaterdontmix.org/anchor_structure_public_comment
  • Draw upon information in this Action Alert, and from www.OilandWaterDontMix.org, to offer objections that are specific and factual.
  • Be sure to demand a public hearing and call for the Michigan DEQ’s full review of the environmental impact of the Enbridge request and feasible and prudent alternatives to Line 5, as required by law.
  • Written comments will be made part of the record and should reference application number 2RD-DFDK-Y35G.

 

Thank you! 

Keeping Our Great Lakes Clean

 

Some of my favorite childhood memories include hiking trips across Northern Michigan and taking in the beauty that is our Great Lakes. As my own children grew up, we regularly went on family trips across Michigan because I wanted to make sure the natural wonders of our state could be passed along to the next generation.

The Great Lakes mean so much to me personally, as they do to millions of Michiganders. They are more than just an economic engine and drinking water source: they are a way of life in Michigan.

That’s why we must protect our Lakes at all costs – and why I am very concerned about the unique threat posed by the Line 5 pipeline running underneath the Straits of Mackinac. Any pipeline leak – no matter how minor – could devastate the Great Lakes watershed and contaminate much of the safe drinking water 40 million people rely on.

According to the University of Michigan, the volume of water going through the Straits of Mackinac is ten times that of Niagara Falls, and it’s rapidly changing currents could carry oil up and down Michigan’s coasts in the event of a spill. Like you, I was alarmed by recent reports that sections of Line 5 are missing critical protective coatings.

In March, I teamed up with Senator Stabenow to demand some answers from Enbridge, whose past assurances about the structural integrity of Line 5 run directly counter to these reports. Here’s what we want to know:

  • How many areas of the pipeline have lost coating, to what extent has coating loss occurred, and how and when were these areas discovered? 
  • What inspections and remedial action are underway to address existing and future coating loss?
  • If areas along Line 5 lack a coating or wrap, how does that affect the structural integrity of the pipeline?

These are just a few of the many serious questions must be addressed by Enbridge. But while we work to find these answers, we can’t afford to keep our eye off other concerns related to pipeline safety in the Great Lakes.

For example, U.S. Coast Guard officials have told me that we do not have adequate research or a plan for cleanup of oil spills in fresh water, especially under heavy ice cover and adverse weather conditions that we see during Michigan winters.

Last year, I was pleased that my bipartisan pipeline safety bill was signed into law by then-President Obama. Among other provisions, it required the federal agency overseeing pipeline safety to consider ice cover when developing oil spill response plans, designated the Great Lakes a high consequence area – making any pipeline in the Lakes subject to higher standards – and required pipeline reviews and oversight on the age and integrity of natural gas and hazardous liquid pipelines.

I’m also focused on efforts to classify Line 5 – and other pipelines crossing the Great Lakes – as offshore pipelines. Right now, Line 5 is considered an onshore pipeline, meaning it’s held to less stringent regulatory standards and liability requirements in the event of a spill. Given the potential for significant economic and ecological harm from an oil spill in the Great Lakes, this change in classification is critical.

Finally, I’ll be looking at ways to improve freshwater spill research and make updates to our coastal maps and data in order to better safeguard our natural resources.

We must continue to highlight the risks posed by Line 5, and FLOW’s efforts to shine a light on these risks is more important than ever. From keeping our Great Lakes free of pollution to highlighting the dangers of invasive species like Asian Carp, I applaud FLOW’s commitment to protecting this unique ecosystem. Together, we can work to keep our Great Lakes clean and safe for future generations of Michiganders.

 

 

 

PR: Citizens Respond to Attorney General Schuette: Get Off the Sidelines on Line 5 and Protect Great Lakes

FOR IMMEDIATE RELEASE

Tuesday, March 28, 2017

Media Contacts: Leonard Page 231-268-8430/ leonard@thepages.net
David Holtz 313-300-4454/david@davidholtz.org

 

Citizens Respond to Attorney General Schuette:

Get Off the Sidelines on Line 5 and Protect Great Lakes

Responding today to a letter from Attorney General Bill Schuette, citizens groups from across the state told state officials that their decision to “stand on the sidelines” by failing to enforce legal requirements on pipeline operator Enbridge Energy Partners is putting the Great Lakes at risk from a catastrophic oil spill in the Straits of Mackinac.

In a March 8 letter to the Oil & Water Don’t Mix campaign, the attorney general, Dept. of Natural Resources Director Keith Creagh and Dept. of Environmental Quality Director Heidi Grether responded to revelations that protective anti-corrosion coatings were missing from 18 areas of Enbridge’s Line 5 in the Straits.  In their letter, Schuette, Creagh and Grether said they would investigate findings in a late 2016 report detailing the missing coatings as well as other evidence calling into question claims by Enbridge that Line 5 is safe.

In their response letter today to state officials, citizens groups told Schuette and other state officials that their failure to assert regulatory authority over Line 5 in the Straits could result in an oil spill that would “devastate our public drinking waters and our water-dependent economy.”

“It is not enough to stand on the sidelines or fail to take action that has the effect of complicity by deferring to Enbridge,” the groups said in their letter to Schuette.  “For nearly two years, we have heard our state leaders declare that the days of this pipeline are numbered and that Line 5 wouldn’t be built today.  However, the State of Michigan has not taken a single preventative measure to make our Great Lakes safer from a catastrophic oil spill.”

The missing Line 5 coatings, the groups said, violated a 1953 easement agreement with the state and should, at a minimum, have resulted in enforcement action against Enbridge.  By instead deferring to Enbridge, the state’s failure to act allows Enbridge to avoid comprehensive review of Line 5 and delays any potential action for months while the state continues to study the pipelines. 

“Attorney General Schuette’s urgency in protecting the Great Lakes and our communities from an oil spill seems to be missing,” said attorney Leonard Page of the Straits Area Concerned Citizens for Peace, Justice and the Environment.  “We need action now, before Line 5 ruptures and destroys our way of life and economy.”

In April 2016 the Oil & Water Don’t Mix campaign wrote Schuette and other state officials, identifying eight violations of the 1953 easement, including missing pipeline anchors, emergency oil spill response plan violations along with issues related to pipeline coatings in the Straits.  While the state notified Enbridge of easement violations, it has yet to require Enbridge to submit to a comprehensive environmental assessment under state law.  A current series of studies being done by the state with $3.6 million in funding from Enbridge are advisory.

“What Attorney General Schuette or any state official can’t tell us is how the structural integrity of these pipelines in the Straits are holding up against age, strong currents, missing anchors and missing coatings,” said David Holtz, chair of Sierra Club Michigan Chapter Executive Committee.  “They can’t tell us that because they are not taking the kind of enforcement actions that could produce answers.  They are not prioritizing protecting the Great Lakes over Enbridge’s profits.”

##

Oil & Water Don’t Mix is a campaign supported by 22 organizations and thousands of citizens businesses who want to end the threat of a Great Lakes oil spill by shutting down the flow of oil through Enbridge’s Line 5 in the Straits of Mackinac.

The March 27, 2017 letter to Attorney General Schuette, the March 8 letter to OWDM from Schuette and OWDM’s original letter to Schuette are located here:

http://www.oilandwaterdontmix.org/owdm_response_to_ag_schuette_michigans_legal_duty

PR: State of Michigan Takes a “Holiday” from Preventing Line 5 Oil Spill Disaster in Great Lakes

FOR IMMEDIATE RELEASE                                                                                         March 9, 2017

Contact:  Liz Kirkwood, Executive Director                                               Email: Liz@FLOWforWater.org

FLOW (For Love of Water)                                                     Office: (231) 944-1568, Cell: (570) 872-4956

 

State of Michigan Takes a “Holiday” from Preventing Line 5 Oil Spill Disaster in Great Lakes

Snyder Administration Watches and Waits as the 64-year-old Dual Pipelines Missing Their Anti-Rust Coating and Structural Supports Continue to Use Mackinac Straits as a High-Risk Shortcut to Private Profits

TRAVERSE CITY, MI – The Snyder administration, in two letters (here and here) released Wednesday, indicated it will seek more information, but take no enforcement action, while continuing to accept Enbridge’s assurances that all is well with dual oil pipelines in the Mackinac Straits that the Canadian company itself has indicated are missing portions of an external, anti-rust coating and lacking 18 anchor supports to prevent the pipes from grinding and bending along the bottom and bursting.

The letters – signed by Attorney General Bill Schuette, Michigan Department of Natural Resources Director Keith Creagh, and Michigan Department of Environmental Quality Director Heidi Grether – describe “inviting” Enbridge to explain the company’s September 2016 report that identifies 19 areas along the submerged steel pipes where the anti-corrosion coating is missing. Enbridge’s report euphemistically calls the missing portions “holidays,” industry jargon for areas where the coating has worn or fallen off. The report outlines a plan for assessing Line 5’s integrity where the coating is gone and acidic waste excreted by invasive mussels that blanket the pipes could be causing corrosion.

Enbridge claims that the report is merely “hypothetical,” even though the report flatly states that the external coating is missing and the words “hypothetical” and “theoretical” are not found in the document.

“The State of Michigan is moving in slow motion to question Enbridge’s claims that its own report doesn’t mean what is plainly says,” said Liz Kirkwood, an environmental attorney and executive director of FLOW, a Traverse City-based water law and policy center dedicated to upholding the public’s rights to use and benefit from the Great Lakes. “When the pipelines finally fail, will the state invite Enbridge to explain what the thick, black substance is pouring out of the 64-year-old pipes and into the drinking water source for nearby Mackinac Island, St. Ignace, and roughly 5 million Michiganders?”

The state issued its March 8 letter in response to February 17 correspondence from the Oil & Water Don’t Mix campaign, which FLOW co-leads with several other leading organizations, that raised grave and detailed concerns about the condition of Line 5 and called for its immediate shutdown.

An Enbridge representative is expected to explain its report at the March 13 quarterly meeting in Lansing of the governor-appointed Michigan Pipeline Safety Advisory Board, whose members include Attorney General Schuette. The advisory board is overseeing the completion of two nominally independent studies funded by Enbridge: one on the financial risk to communities and the Pure Michigan economy of a Line 5 oil spill in the Mackinac Straits and the other on alternatives to the aging pipeline that could avoid such a disaster. These two studies are expected by June 2017.

Enbridge is infamous for leaking more than one million gallons of heavy tar sands oil into the Kalamazoo River watershed near Marshall, Michigan, in 2010, fouling nearly 40 miles of the river and shore, sickening numerous people, harming wildlife, and forcing more than 100 families to permanently abandon their homes and property.

The failure to adequately maintain the Line 5 pipelines, including a lack of supports to prevent bending of the pipeline – is a breach of Enbridge’s 1953 legal easement agreement with the State of Michigan that allows the company to occupy public waters and state bottomlands. The failures documented in the Enbridge report add to the mounting evidence of the unacceptable risk that this infrastructure poses to the Great Lakes.

A three-minute video of Line 5 pipelines in the Straits, researched and edited by FLOW’s engineering expert Dr. Ed Timm, reveals the physical deterioration of Line 5, with missing and dislodged coating, broken bands, detached wooden structural slats, unsupported segments, and possible rust and pitting.

In addition, a just-released technical note prepared by Dr. Timm regarding Line 5 reinforces the urgent need for the state to immediately shut down Line 5 while it evaluates the integrity of the aging infrastructure that pumps nearly 23 million gallons of oil a day through the Mackinac Straits before eventually reaching refineries in Sarnia, Ontario. Specifically, this technical note concludes the following:

  • Line 5 is not immune to corrosion and stress cracking despite its thick walls, contrary to Enbridge’s claims;
  • The asphalt enamel based coating system is compromised or missing on many areas of the pipe;
  • The extent of the coverage by invasive mussels on the pipelines makes it “impossible” to evaluate how much of the coating system is compromised;
  • The easement-required wooden slats that were designed to protect from point loads and abrasion are missing entirely on portions of the pipelines; and
  • The peak currents in the Mackinac Straits are nearly twice the maximum velocity considered when the pipeline was designed, adding significant stress;
  • A full study of the integrity of the coating system that includes a careful examination of the impact of the biofouling on the pipelines is critical to making a proper fitness-for-service evaluation.

“The evidence demands that the State of Michigan respond and fulfill its affirmative fiduciary duty,” wrote Jim Olson, an environmental attorney and FLOW’s president, in a March 9 follow-up letter to the State of Michigan. “It is not enough to stand by the sidelines and merely request additional information from Enbridge given the high risk of a catastrophic oil spill in the Great Lakes that would devastate our public drinking waters and our water-dependent economy. ‘Pure Michigan’ should not just be an advertising slogan.”

For more information, visit the FLOW website at www.FLOWforWater.org

# # #

FINAL FLOW-Line 5 Media Release-Pipeline Coating 3-9-2017

FLOW Releases New Fact Sheets Regarding Line 5

FOR IMMEDIATE RELEASE                                                                               February 6, 2017

Contact:  Liz Kirkwood, Executive Director                                        Email: Liz@FLOWforWater.org

FLOW (For Love of Water)                                             Office: (231) 944-1568, Cell: (570) 872-4956

 

Research Identifies Viable Options to Enbridge’s Aging “Line 5” for U.P.’s Propane Supply and Michigan, Midwest Demand for Oil

Developing and Implementing Alternatives to Aging Pipelines in the Mackinac Straits is Key to Preventing Great Lakes Oil Spill Disaster

TRAVERSE CITY, MI – Just one to two propane rail cars or a few tanker trucks a day could replace the Line 5 pipeline’s Upper Peninsula propane capacity without risking energy security in the U.P. or a catastrophic Great Lakes oil spill, according to experts for FLOW, a water law and policy center dedicated to upholding the public’s rights to use and benefit from the Great Lakes.

FLOW’s latest research shows that Line 5 supplies only about one-third to one-half of the Upper Peninsula’s propane, considerably less than the 65-85 percent that pipeline-owner Enbridge asserts, based on FLOW’s estimates using publicly available data. And importantly, FLOW’s estimate represents a relatively small quantity of propane to transport, as the Upper Peninsula is sparsely populated and fewer than 1-in-5 U.P. residents lives in housing heated by propane. (Click here to see the new FLOW fact sheet on Line 5 and U.P. propane supply option.)

Enbridge’s inflated propane claims have needlessly fostered concern among local residents and state lawmakers that shutting down the aging pipeline to prevent a catastrophic oil spill in the Mackinac Straits would result in freezing Upper Peninsula residents in their homes.

“It’s clearer than ever that Line 5 is not vital to Michigan’s energy security and, in fact, threatens ourPure Michigan economy and the drinking water supply to communities from Mackinac Island to metropolitan Detroit,” said Liz Kirkwood, an environmental attorney and FLOW’s executive director. “What’s needed now is a little ingenuity and a willingness to look for answers beyond the status quo with a steel pipeline transporting oil and liquid natural gas that was installed underwater in 1953.”

FLOW’s latest findings serve as an update to FLOW’s December 2015 expert report that concluded that decommissioning the twin pipelines in the Mackinac Straits to prevent a disastrous oil spill would not disrupt Michigan’s or the Midwest’s crude oil and propane supply, contrary to Enbridge assertions.

FLOW’s research is meant to inform deliberations by a state advisory board that meets next on March 13 in Lansing. The State of Michigan in partnership with the Michigan Pipeline Safety Advisory Board is overseeing the completion of two independent studies funded by Enbridge: one on the financial risk to communities and the Pure Michigan economy of a Line 5 oil spill in the Mackinac Straits and the other on alternatives to the aging pipeline that could avoid such a disaster. These two studies are expected by mid-2017.

FLOW supports decommissioning Line 5 to protect the Great Lakes, tribal fishing rights, and citizens’ public trust rights to navigate, boat, drink, fish, swim, and benefit from these precious waters. The State of Michigan must act with urgency to identify a viable plan for meeting Michigan’s energy needs without threatening the Great Lakes or public-owned bottomlands, which the Enbridge pipelines occupy under a 1953 easement with the state.

FLOW’s December 2015 research determined that available capacity and flexibility to meet energy demand in the Great Lakes region already exists in the North American pipeline system run not only by Canadian-based Enbridge, but also by competitors supplying the same refineries in Detroit, Toledo, and Sarnia, Ontario.

Furthermore, at least 90 percent of the 540,000 barrels per day of oil and liquid natural gases moved through Line 5 end up in Canadian refineries, undermining claims that the pipeline is an important source of crude for the Marathon refinery in Detroit. (Click here to see the new FLOW fact sheet on alternatives to Line 5.)

“Our work to date has led to the conclusion that Line 5 in the Straits of Mackinac can be shut down, without resorting to additional oil trains, tank trucks, or lake tankers to serve regional refineries, as Enbridge would have you believe,” said Gary Street, a retired chemical engineer and former director of engineering at Dow Environmental – AWD Technologies. “In addition, straightforward steps can be taken to assure customers in the Upper Peninsula of an on-going supply of propane, which is offloaded from Line 5 in Rapid River near Escanaba before ever reaching the segment that would be decommissioned in the Mackinac Straits.”

For more information:

# # #

Bipartisan Congressional Bill Offers Orderly Mechanism to Shut Down Line 5 Because of High Magnitude of Harm and Risks.

Line 5 Pipeline

The article linked below provides a good synopsis of the new federal bill H.R. 458 that would provide an orderly mechanism to shut down Line 5 if a 12-month study determines the risk is simply too significant to allow crude oil to flow through the heart of the Great Lakes.  The bill’s sponsors Congressmen Dave Trott (R) and Debbie Dingell (D) have launched a just approach to removing Line 5 because of its magnitude of harm and high risk.

It is important to remember that risk is not just inspections and probability. Risk (R) equals the magnitude of harm (H) multiplied by probability (P). When the magnitude of harm is high, like the devastation to the Straits, drinking water, communities, fishing, tribal interests, riparian landowners, resorts, including Mackinac Island, and all of the tourist related business, probability is less important. Under high risk management systems, the immediate action is to remove the high risk by implementing an alternative that reasonably accomplishes the overall purpose – in this case, transport of crude oil to refineries. Refineries exist in the South, Midwest, West, and East. The pipeline system in the U.S. and Canada is a mesh of pipelines to carry oil. Capacity exists within the system. In fact, they must because pipelines are shut down, and there must always be a backup plan. Given the age of the pipeline, 63 years, and the massive currents, and the high magnitude of harm, Enbridge needs to look for another way to move oil in cooperation with the overall system it manages. It doubled capacity when it replaced Line 6b, as part of the deal for devastating harm to Kalamazoo River fishery, ecosystem, and property owners. With this new line 6b with double the capacity, Enbridge does not need Line 5, it is time to shut it down. The bill, if passed, which it should be if Congress has any sense at all regarding the value of the Great Lakes and water resources in this country, should lead to the removal of Line 5, and finally the removal of the last crude oil line in Great Lakes waters. Let’s make sure no new crude oil pipelines or ships carry crude oil, including dilbit from Tar Sands, in, over, or on the Great Lakes. When there are existing routes, lots of companies, and the crude oil network runs on land where it is easier to inspect, twenty percent of the world’s fresh surface water should not be at risk. 

Read an article on the bill here by Garret Ellison,

OR

Read the text of H.R. 458 here.