Tag: Enbridge

Liz Kirkwood’s Comment to the PSAB

  • Over two years ago, the Governor of Michigan created this Advisory Board by Executive Order to “Review and make recommendations for statutory, regulatory, and contractual implementation of the Michigan Petroleum Pipeline Task Force Report.”  This meant the board was required to oversee an independent and comprehensive analysis of risks and alternatives. 

 

  • Instead we Michiganders have (1) no risk report, (2) a flawed alternative report that still ignores the most credible alternative – using existing and expanded pipeline infrastructure around the Great Lakes, and (3) the Governor’s Thanksgiving deal with Enbridge that locks in a tunnel alternative under 20 percent of the planet’s fresh surface water. 

 

  • What our leaders have now is Tunnel Vision. 

 

  • Tens of thousands of citizens of this state have taken the time to study these matters and express their views to you.  Members of this board have spent countless hours on your task.  All of that for naught because of a closed-door agreement between Enbridge and the governor.

 

  • The deal allows Enbridge’s decaying Line 5 oil pipelines to continue to occupy the publicly owned lakebed at the Straits of Mackinac indefinitely, despite the company’s record of deception, poor stewardship, and bungled emergency response.  It’s a reward for failure.

 

  • We know a fair alternative analysis can be done.  In fact, in December 2015, FLOW offered a thorough analysis for the decommissioning of Line 5 that established an alternative that reasonably met the basic purpose of transporting crude oil to the various refineries within and beyond the Great Lakes region.  Why hasn’t the state done the same?

 

  • The Governor’s deal has mapped a blueprint that narrows the alternatives to some form of tunnel replacement in the Straits, the Great Lakes, and St. Clair River.  Moreover, the deal will bind the state to a new replacement of the entire 645 miles of Line 5 through Michigan and potentially open the door to heavy tar sands.

 

  • In the interest of full transparency and public knowledge, this board can do the people of Michigan a service by asking for a full public accounting for this deal, and by demanding a credible adverse weather provision to shut down Line 5 and a comprehensive alternatives analysis as required by law. The future of Line 5 is about the future of the Great Lakes.  And fortunately, public trust law makes this the public’s decision, not a closed-door deal between the Governor and Enbridge.     

 

Thank you.

Liz Kirkwood, Executive Director


 

Failed Leadership and Line 5


Our State’s leadership in the handling of Enbridge’s Line 5 in the Straits of Mackinac has gone from bad to worse. In light of disclosures by Enbridge of a failed pipeline design and the refusal on the part of our State leaders to take action to prevent devastating harm to the Great Lakes, it is time for leaders to either step up or step aside and let the voters or courts decide.

Enbridge has revealed previously withheld documentation showing bending of pipelines from extreme currents, delaminating protective cover, and numerous sections of bared steel open to corrosion. What Enbridge doesn’t understand is this: The State is trustee for citizens who are legally recognized beneficiaries of the public trust in the Great Lakes. The State trustee has a duty to prevent unacceptable harm or risks to the Great Lakes and the boating, fishing, swimming, and drinking water that depend on them. The decision does not belong to Enbridge but to our State’s leaders as trustees of these public paramount waters. Risk is a function of magnitude of harm; the higher the harm, the greater the risk. So it doesn’t matter what Enbridge executives think or say, or what their studies say after consultants have admitted conflicts of interest and withheld critical information on the failed condition of the lines.

Our State’s leaders must put an end to this now. Statements by Governor Snyder, DEQ Director Grether, and Attorney General Schuette about “serious concern” or “disappointment” do not go far enough. The proper response to the serious risk of unthinkable harm to the Straits and Great Lakes is not mere feeling; it is leadership and action. Governor Snyder’s recent agreement has belied even his disappointment. He expressly short circuited the his own advisory board and a citizen process established by his own Executive Order. The agreement expressly narrows a comprehensive alternative study to find a way to avoid crude oil pipelines in the Great Lakes, by expressly agreeing to a replacement of Line 5 in the Straits of Mackinac and the St. Clair River. So much for disappointment, he’s handing Enbridge a large Christmas present.

The Governor and DEQ should have required Enbridge to prove that there is no alternative to crossing under the Great Lakes for pipeline transport to Canada. It is unlikely Enbridge could prove that a non-Great Lakes pipeline alternative does not exist, given the fact that Enbridge recently doubled its design capacity in Line 6b across southern Michigan to Sarnia from 400,000 to 800,000 barrels. To win approval from the Public Service Commission to double its capacity across southern Michigan after the Kalamazoo disaster, Enbridge repeatedly testified if approved the doubled capacity would fulfill the company’s current and future needs, as well as those of Canada and the smaller needs of Michigan.

Our leaders must suspend the transport of crude oil through Line 5, and order Enbridge to start over by revoking the easement the state granted in 1953 and making the company comply with the laws and public trust that protect the Great Lakes. A bank trustee would have been replaced a year ago for such inaction as our state’s. If our leaders, the sworn trustees of our Great Lakes, don’t take action, they, too, should be replaced. Hopefully, it won’t come to that. If it does, then our third branch of government—the courts—should step in as they would in a receivership where management has failed.

It will not have to come to this if our leaders put a stake in the ground and suspend transport of oil. It will finally after three years of “cat and mouse” place the burden where it belongs: on Enbridge. Enbridge must be forced under rule of law to prove no catastrophic harm or acceptable risk and that it has no alternative to a pipeline in the Great Lakes. The truth is Line 5 under the Straits violates “reasonably prudent person” standard in the Easement, a common sense covenant that the company agreed to when it was granted the 1953 easement. It is no longer prudent to risk the Great Lakes with a crude oil spill of tar balls, dead fish, and oily wildlife and beaches.

The message and course of action for our Great Lakes State leaders is clear: Step up or step aside. If not, the courts or voters will do it for you.


Flint and the Straits of Mackinac

What do the Flint drinking water catastrophe and the recent agreement regarding the Enbridge pipeline at the Straits of Mackinac have in common?  Both are the result of a gubernatorial administration with fundamental mistrust of the public it serves.

In Flint, the Snyder Administration appointed an emergency manager to short-circuit democratic processes and act paternally on behalf of a community it deemed incapable of self-government.  The result was appalling damage to the health and well-being of the community.

This week, the Snyder Administration appointed itself emergency manager of the imminent danger posed to the Great Lakes by Enbridge, apparently deciding the public, the Governor’s own Pipeline Safety Advisory Board, and the DEQ under the State’s Great Lakes protection laws were incapable of contributing to a rational decision.  Astonishingly, the public engagement process the Governor himself set in motion with an executive order more than two years ago was essentially discarded in favor of a pact secretly negotiated with Enbridge.  The thousands of people and hundreds of organizations and communities who took the time to comment on the future of the pipeline were ignored in favor of assurances from a company responsible for the worst inland oil spill in U.S. history.

Democracy and public participation are under attack at many levels, and the result is poor public policy. The Governor’s agreement with Enbridge puts the Great Lakes at risk.


Pitting Corrosion and the Impact of Zebra and Quagga Mussels on Bare Steel Pipelines

FOR IMMEDIATE RELEASE TO MEDIA: November 3, 2017


Liz Kirkwood, Executive Director                                                                  Cell: 570-872-4956
FLOW (For Love of Water)                                                                             Email: liz@flowforwater.org

Gary Street, Technical Advisor                                                                       Phone: 231-944-1568
FLOW (For Love of Water)                                                               


Portions of the steel oil pipelines in the Mackinac Straits may have lost half their wall thickness since installation in 1953 and become dangerously weakened due to hard-to-detect pitting corrosion, an engineering expert said today.

The independent analysis further strengthens the case for an immediate shutdown of Line 5 to prevent a catastrophic oil spill in the Great Lakes, according to FLOW, a Great Lakes law and policy center based in Traverse City. The full analysis can be found at www.FLOWforWater.org.

The possible damage stems from invasive zebra and quagga mussels that have covered portions of the dual underwater pipelines for years, inhibiting external inspection of Line 5 while possibly weakening the steel.

“The cause of their corrosiveness is the excrement from the mussels, which is acidic. An acidic deposit on bare steel leads to corrosion,” said Gary Street, MS, PE, the former director of engineering at Dow Environmental who conducted the analysis. Street notes that pipeline inspection tools called “smart pigs,” which Enbridge uses to detect corrosion, are not very accurate in detecting pitting corrosion.

The disturbing possibility of a significantly weakened Line 5 in the Mackinac Straits comes after recent acknowledgement by the pipeline owner and operator, Enbridge, that there are several large areas of the pipeline where the protective coating is missing. According to Enbridge, the bare steel on Line 5 in the Mackinac Straits was detected by Canadian oil transport giant Enbridge in 2014 when the company installed more supports, but not revealed to regulators until this summer.

“What else is Enbridge hiding from the public and state regulators?” asked Liz Kirkwood, executive director of FLOW and an environmental lawyer. “Attorney General Bill Schuette must immediately enforce the laws protecting the Great Lakes and revoke the state easement that has allowed a private Canadian company conditional use of our public waters and bottomlands.”

Not all types of corrosion are equally harmful. Some forms are far worse than others. Pitting corrosion is a localized form of corrosion by which tiny cavities or “holes” are produced in the material. The National Association of Corrosion Engineers has stated, “While corrosion of bare steel can take many forms, the most insidious, is pitting corrosion.”

“The prudent scenario is to assume that damage originally occurred in 2003 when the first of the new supports was installed,” said Street, whose 35+ year career in industry and consulting has covered an extensive range of experience in environmental engineering, chemical process design, ethanol production processes, minimization of waste materials, project management, and engineering management. “That being the case, it is very possible that the Line 5 pipe wall has suffered serious pitting corrosion beginning at that time. Making the matter worse, pitting corrosion is very difficult to detect.”

Enbridge acknowledged the areas of external anti-corrosion coating loss in September. Several of the areas are larger than the “Band-Aid“-sized areas Enbridge initially described when the gaps were revealed. The largest patch of exposed pipeline metal is 16 inches long and 10 inches wide. Others are narrower but also exceed a foot in length.

Also detailed in the Enbridge reports is a “disturbed” coating area that’s more than 3 feet long, a “dislodged” coating area that’s 13 feet long and a mysterious 8-inch “white deposit” of unknown origin that Enbridge says “remains under investigation.”

#   #   #


Statement to Pipeline Safety Advisory Board

Line 5 Pipeline

 

The state pipeline safety advisory board met Monday to discuss next steps on Line 5 at the Straits of Mackinac, in the wake of new revelations about shoddy Line 5 maintenance by Enbridge. FLOW's statement at the meeting said enough is known about the pipeline's condition and poor maintenance for the state to immediately revoke the pipeline's easement to traverse the Straits.


 

Enbridge’s Neglect of 64-Year-Old “Line 5” Pipelines in Mackinac Straits Requires State to Apply Law, Stop Oil, Reject Permit

Liz Kirkwood, Executive Director                                                  Cell: 570-872-4956
FLOW (For Love of Water)                                                          Email: liz@flowforwater.org

Jim Olson, Founder & President                                                   Cell: 231-499-8831
FLOW (For Love of Water)                                                          Email: olson@envlaw.com


ST. IGNACE – The state of Michigan must immediately apply the law, stop Line 5’s oil flow, and reject a Canadian company’s application to extract more life out of its decaying steel pipelines built in 1953, according to FLOW, a Traverse City-based Great Lakes water law and policy center in public comments made today. The comments came at a public hearing in St. Ignace on Enbridge’s bid for state approval to shore up parts of Line 5 that are bent or deformed due to the company’s neglect and support other areas potentially prone to erosion.

“Enbridge characterizes the application as seeking authorization for routine maintenance,” said Liz Kirkwood, FLOW’s Executive Director and environmental attorney. “The reality is that Enbridge is scurrying to rectify its dangerous neglect of maintenance over decades, including multiple violations of a legal agreement to properly anchor its dual pipelines against the swift currents in the Straits.” 

A recent report by Dr. Ed Timm, a FLOW adviser and former Dow Chemical engineer, shows Line 5 is bent and deformed where Enbridge wants to anchor it. The report presents new evidence of structural damage to the western pipe where Enbridge seeks to install five of the 22 anchors into Lake Michigan’s public bottomlands, stemming from a company pattern of violating a 1953 easement granted by the state allowing Enbridge to occupy the Mackinac Straits.

The state’s easement agreement allowing Line 5 to occupy the Mackinac Straits limits unsupported spans to no more than 75 feet, but a 2003 survey identified 16 unsupported spans greater than 140 feet; the longest at 224 feet on the east leg and 286 feet on the west leg. Other Enbridge inspection report revealed nearly 250 instances between 2005 and 2016 of unsupported spans on the pipelines exceeded a 75-foot legal limit in violation of Michigan’s easement agreement with Enbridge. This track record does not provide confidence that the company will fulfill its obligations in the future.

By attempting to cloak the results of its neglect and avoiding an assessment of Line 5’s impacts and alternatives, Enbridge is perpetuating the imminent threat to the Great Lakes and the protected public uses that include fishing, commerce, navigation, recreation, and drinking, according to a legal analysis by FLOW.

In fact, the company’s poor performance as well as the massive work proposed provides a compelling legal basis for the state to consider feasible and prudent alternatives to continued operation of the dual Line 5 pipelines.

“The state of Michigan must consider under rule of law whether there are viable options to the piecemeal patch-up of these aging steel oil pipelines threatening the Great Lakes,” said Jim Olson, FLOW’s founder and president and a renowned water rights attorney. “Enbridge has expanded Line 5 and the new Line 78 from Indiana across lower Michigan to Sarnia under the rubric of ‘maintenance.’ Our cities, villages, and citizens have ended up with Enbridge’s version of the Keystone XL right here in the Great Lakes, and it happened without the public notice, hearings, and independent impact and alternative analyses required by law.”

Line 5 transports nearly 23 million gallons of oil and natural gas liquids each day through the Mackinac Straits, 80 percent more volume than its past design capacity after several of its so-called “maintenance” upgrades.

Of particular concern is Enbridge’s continued failure to predict and prevent the cumulative impacts on Line 5 of lakebed erosion caused by Straits currents that frequently reverse and can exceed 10 times the flow over Niagara Falls.

Contrary to assertions by Enbridge, the state taking action to stop Line 5’s oil flow in the Mackinac Straits to prevent a catastrophic oil spill would not disrupt Michigan’s or the Midwest’s crude oil and propane supply, according to a set of expert reports FLOW released in December 2015. Available capacity and flexibility to meet energy demand in the Great Lakes region already exists in the North American pipeline system run not only by Enbridge, but also by competitors supplying the same refineries in Detroit, Toledo, and Sarnia, Ontario.

“The fact is, Line 5 is not essential,” said Rick Kane, a Michigan-based hazardous materials risk management specialist advising FLOW. “The regional pipeline system can supply crude oil to Michigan and surrounding refineries while eliminating the risk that Line 5 poses to the Great Lakes,” Kane said. “Feasible and prudent alternatives exist to support domestic needs, as well as exports.  However, pipeline company owners will not move to implement any alternatives as long as Line 5 operates and the public continues to carry the risk.”


Abrupt cancellation of conflict-plagued Line 5 study sparks demand for transparency from DEQ

LANSING – Oil & Water Don’t Mix today said the Michigan Department of Environmental Quality’s decision to cancel a study that was rife with conflicts of interest amplifies the need to shut down the Line 5 pipelines once and for all – and called on state leaders to disclose all details of the draft study that was plagued by conflicts of interest.

“Citizens groups have been sounding the alarm bells for months about the massive conflicts of interest between Big Oil companies and the departments that are charged with regulating them, and this cancellation raises more questions than it answers,” said David Holtz, Chair of Sierra Club Michigan Chapter and Oil & Water Don’t Mix campaign coordinator. “The State of Michigan owes all citizens a full account of how and why this study was allowed to continue, even in light of the massive conflicts of interest. Michiganders deserve answers.”

“This study was tainted by huge conflicts of interest and a complete lack of transparency from the state, all with Line 5 continuing to pose a clear danger to our Great Lakes, our economy, and our way of life,” said Liz Kirkwood, executive director of For Love of Water. “In addition to a full and complete disclosure of the facts regarding this cancellation, we demand that Attorney General Schuette start acting like the lead attorney for the people of Michigan, who elected him to protect us and the Great Lakes, and shut down Line 5 without delay.”

# # #

 

Don’t delay! Submit your public comment today!

 

Click here to read the post on the Michigan Petroleum Pipelines website! 

 

 

Action Alert: Enbridge Trying to Squeeze More Life Out of “Line 5” in the Mackinac Straits

Take Action Now!

Urgent Threat: Enbridge is courting an oil spill disaster again in Michigan, and this time the Great Lakes are at risk. The public has until June 29, 2017, to oppose the Canadian energy transport giant’s request for state permission to squeeze more life out of a cracked, dented, and deformed pair of pipelines that push 23 million gallons of oil a day across the bottom of the Mackinac Straits, where Lake Michigan and Lake Huron meet. The request to continue the piecemeal patch up of the 64-year-old “Line 5” pipelines threatens the drinking water source for more than 40 million people, the economic engine for the Great Lakes region, and a way of life for millions of North Americans.

Terrible Track Record: Recall that Enbridge in 2010 caused the largest inland oil spill in U.S. history when its southern Michigan pipeline ruptured and dumped more than one million gallons of heavy tar sands oil into the Kalamazoo River watershed. That failure sickened 150 people, and permanently drove 150 families from their homes, taking four years and over $1.2 billion to clean up to the extent possible. Enbridge’s Line 5 has a similar dark history, with at least 29 spills totaling more than one million gallons of oil spread along its path in Michigan and Wisconsin since 1953.

Damage Done: Now Enbridge has applied to the State of Michigan for a permit to install more underwater anchor supports on its antiquated Line 5 pipelines in the Mackinac Straits, which the University of Michigan calls the “worst possible place” for a Great Lakes oil spill. The 22 anchor supports are another belated attempt to keep Line 5 from shifting, bending, and grinding on the bottom in the powerful underwater currents at the Straits, but the damage is already done. These supports are merely the latest in a series of stopgap measures that ignore decades of metal fatigue and stress on the pipeline, which is now well past its 50-year life expectancy and should be permanently shut down as soon as possible.

Follow the Facts

Public records reveal that…

  • From the 1970s through the 1990s, Enbridge installed grout bags to prop up Line 5, attempting to meet the state’s requirement under the 1953 easement to support the steel pipeline at least every 75 feet along the publicly owned bottom of the Great Lakes.
  • In 2001, Enbridge declared an emergency on Line 5 in the Straits to stabilize stretches or spans of the pipeline that had become dangerously unsupported for over 130 feet because of “washouts” of the lake bottom and grout bags caused by swift currents that, records show, were underestimated when the pipeline was designed. 
  • Recently it was revealed that Enbridge was out of compliance likely for decades with the legally required safety margin, allowing 16 spans of Line 5 to go unsupported for lengths greater than 140 feet, with the longest being 224 feet on the east pipeline and 286 feet on the west pipeline – nearly four times the legal limit.
  • With no reliable model to predict lakebed washouts due to the highly dynamic nature of currents in the Mackinac Straits, Enbridge cannot meet its legal duty under the state easement to prudently operate this pipeline.
  • Enbridge incorrectly categorizes its proposed patchwork response to Line 5’s major structural defects as “routine maintenance” when the company has, in fact, been systematically expanding the capacity of Line 5 and Line 6b in southern Michigan to carry Canadian oil heading mostly back to Canadian refineries and to overseas markets.

This strategy has previously enabled the company to avoid State of Michigan review of the safety and necessity of the pipeline itself, and dodge the legally required consideration of alternative routes and methods that do not threaten the Great Lakes.

Take Action Now

The public has until June 29, 2017, to submit comments to the Michigan Department of Environmental Quality opposing Enbridge’s bid to keep Line 5 on life support and seeking to prevent a Great Lakes oil spill disaster.

  • Submit comments at http://www.oilandwaterdontmix.org/anchor_structure_public_comment
  • Draw upon information in this Action Alert, and from www.OilandWaterDontMix.org, to offer objections that are specific and factual.
  • Be sure to demand a public hearing and call for the Michigan DEQ’s full review of the environmental impact of the Enbridge request and feasible and prudent alternatives to Line 5, as required by law.
  • Written comments will be made part of the record and should reference application number 2RD-DFDK-Y35G.

 

Thank you! 

PR: Citizens Respond to Attorney General Schuette: Get Off the Sidelines on Line 5 and Protect Great Lakes

FOR IMMEDIATE RELEASE

Tuesday, March 28, 2017

Media Contacts: Leonard Page 231-268-8430/ leonard@thepages.net
David Holtz 313-300-4454/david@davidholtz.org

 

Citizens Respond to Attorney General Schuette:

Get Off the Sidelines on Line 5 and Protect Great Lakes

Responding today to a letter from Attorney General Bill Schuette, citizens groups from across the state told state officials that their decision to “stand on the sidelines” by failing to enforce legal requirements on pipeline operator Enbridge Energy Partners is putting the Great Lakes at risk from a catastrophic oil spill in the Straits of Mackinac.

In a March 8 letter to the Oil & Water Don’t Mix campaign, the attorney general, Dept. of Natural Resources Director Keith Creagh and Dept. of Environmental Quality Director Heidi Grether responded to revelations that protective anti-corrosion coatings were missing from 18 areas of Enbridge’s Line 5 in the Straits.  In their letter, Schuette, Creagh and Grether said they would investigate findings in a late 2016 report detailing the missing coatings as well as other evidence calling into question claims by Enbridge that Line 5 is safe.

In their response letter today to state officials, citizens groups told Schuette and other state officials that their failure to assert regulatory authority over Line 5 in the Straits could result in an oil spill that would “devastate our public drinking waters and our water-dependent economy.”

“It is not enough to stand on the sidelines or fail to take action that has the effect of complicity by deferring to Enbridge,” the groups said in their letter to Schuette.  “For nearly two years, we have heard our state leaders declare that the days of this pipeline are numbered and that Line 5 wouldn’t be built today.  However, the State of Michigan has not taken a single preventative measure to make our Great Lakes safer from a catastrophic oil spill.”

The missing Line 5 coatings, the groups said, violated a 1953 easement agreement with the state and should, at a minimum, have resulted in enforcement action against Enbridge.  By instead deferring to Enbridge, the state’s failure to act allows Enbridge to avoid comprehensive review of Line 5 and delays any potential action for months while the state continues to study the pipelines. 

“Attorney General Schuette’s urgency in protecting the Great Lakes and our communities from an oil spill seems to be missing,” said attorney Leonard Page of the Straits Area Concerned Citizens for Peace, Justice and the Environment.  “We need action now, before Line 5 ruptures and destroys our way of life and economy.”

In April 2016 the Oil & Water Don’t Mix campaign wrote Schuette and other state officials, identifying eight violations of the 1953 easement, including missing pipeline anchors, emergency oil spill response plan violations along with issues related to pipeline coatings in the Straits.  While the state notified Enbridge of easement violations, it has yet to require Enbridge to submit to a comprehensive environmental assessment under state law.  A current series of studies being done by the state with $3.6 million in funding from Enbridge are advisory.

“What Attorney General Schuette or any state official can’t tell us is how the structural integrity of these pipelines in the Straits are holding up against age, strong currents, missing anchors and missing coatings,” said David Holtz, chair of Sierra Club Michigan Chapter Executive Committee.  “They can’t tell us that because they are not taking the kind of enforcement actions that could produce answers.  They are not prioritizing protecting the Great Lakes over Enbridge’s profits.”

##

Oil & Water Don’t Mix is a campaign supported by 22 organizations and thousands of citizens businesses who want to end the threat of a Great Lakes oil spill by shutting down the flow of oil through Enbridge’s Line 5 in the Straits of Mackinac.

The March 27, 2017 letter to Attorney General Schuette, the March 8 letter to OWDM from Schuette and OWDM’s original letter to Schuette are located here:

http://www.oilandwaterdontmix.org/owdm_response_to_ag_schuette_michigans_legal_duty

PR: State of Michigan Takes a “Holiday” from Preventing Line 5 Oil Spill Disaster in Great Lakes

FOR IMMEDIATE RELEASE                                                                                         March 9, 2017

Contact:  Liz Kirkwood, Executive Director                                               Email: Liz@FLOWforWater.org

FLOW (For Love of Water)                                                     Office: (231) 944-1568, Cell: (570) 872-4956

 

State of Michigan Takes a “Holiday” from Preventing Line 5 Oil Spill Disaster in Great Lakes

Snyder Administration Watches and Waits as the 64-year-old Dual Pipelines Missing Their Anti-Rust Coating and Structural Supports Continue to Use Mackinac Straits as a High-Risk Shortcut to Private Profits

TRAVERSE CITY, MI – The Snyder administration, in two letters (here and here) released Wednesday, indicated it will seek more information, but take no enforcement action, while continuing to accept Enbridge’s assurances that all is well with dual oil pipelines in the Mackinac Straits that the Canadian company itself has indicated are missing portions of an external, anti-rust coating and lacking 18 anchor supports to prevent the pipes from grinding and bending along the bottom and bursting.

The letters – signed by Attorney General Bill Schuette, Michigan Department of Natural Resources Director Keith Creagh, and Michigan Department of Environmental Quality Director Heidi Grether – describe “inviting” Enbridge to explain the company’s September 2016 report that identifies 19 areas along the submerged steel pipes where the anti-corrosion coating is missing. Enbridge’s report euphemistically calls the missing portions “holidays,” industry jargon for areas where the coating has worn or fallen off. The report outlines a plan for assessing Line 5’s integrity where the coating is gone and acidic waste excreted by invasive mussels that blanket the pipes could be causing corrosion.

Enbridge claims that the report is merely “hypothetical,” even though the report flatly states that the external coating is missing and the words “hypothetical” and “theoretical” are not found in the document.

“The State of Michigan is moving in slow motion to question Enbridge’s claims that its own report doesn’t mean what is plainly says,” said Liz Kirkwood, an environmental attorney and executive director of FLOW, a Traverse City-based water law and policy center dedicated to upholding the public’s rights to use and benefit from the Great Lakes. “When the pipelines finally fail, will the state invite Enbridge to explain what the thick, black substance is pouring out of the 64-year-old pipes and into the drinking water source for nearby Mackinac Island, St. Ignace, and roughly 5 million Michiganders?”

The state issued its March 8 letter in response to February 17 correspondence from the Oil & Water Don’t Mix campaign, which FLOW co-leads with several other leading organizations, that raised grave and detailed concerns about the condition of Line 5 and called for its immediate shutdown.

An Enbridge representative is expected to explain its report at the March 13 quarterly meeting in Lansing of the governor-appointed Michigan Pipeline Safety Advisory Board, whose members include Attorney General Schuette. The advisory board is overseeing the completion of two nominally independent studies funded by Enbridge: one on the financial risk to communities and the Pure Michigan economy of a Line 5 oil spill in the Mackinac Straits and the other on alternatives to the aging pipeline that could avoid such a disaster. These two studies are expected by June 2017.

Enbridge is infamous for leaking more than one million gallons of heavy tar sands oil into the Kalamazoo River watershed near Marshall, Michigan, in 2010, fouling nearly 40 miles of the river and shore, sickening numerous people, harming wildlife, and forcing more than 100 families to permanently abandon their homes and property.

The failure to adequately maintain the Line 5 pipelines, including a lack of supports to prevent bending of the pipeline – is a breach of Enbridge’s 1953 legal easement agreement with the State of Michigan that allows the company to occupy public waters and state bottomlands. The failures documented in the Enbridge report add to the mounting evidence of the unacceptable risk that this infrastructure poses to the Great Lakes.

A three-minute video of Line 5 pipelines in the Straits, researched and edited by FLOW’s engineering expert Dr. Ed Timm, reveals the physical deterioration of Line 5, with missing and dislodged coating, broken bands, detached wooden structural slats, unsupported segments, and possible rust and pitting.

In addition, a just-released technical note prepared by Dr. Timm regarding Line 5 reinforces the urgent need for the state to immediately shut down Line 5 while it evaluates the integrity of the aging infrastructure that pumps nearly 23 million gallons of oil a day through the Mackinac Straits before eventually reaching refineries in Sarnia, Ontario. Specifically, this technical note concludes the following:

  • Line 5 is not immune to corrosion and stress cracking despite its thick walls, contrary to Enbridge’s claims;
  • The asphalt enamel based coating system is compromised or missing on many areas of the pipe;
  • The extent of the coverage by invasive mussels on the pipelines makes it “impossible” to evaluate how much of the coating system is compromised;
  • The easement-required wooden slats that were designed to protect from point loads and abrasion are missing entirely on portions of the pipelines; and
  • The peak currents in the Mackinac Straits are nearly twice the maximum velocity considered when the pipeline was designed, adding significant stress;
  • A full study of the integrity of the coating system that includes a careful examination of the impact of the biofouling on the pipelines is critical to making a proper fitness-for-service evaluation.

“The evidence demands that the State of Michigan respond and fulfill its affirmative fiduciary duty,” wrote Jim Olson, an environmental attorney and FLOW’s president, in a March 9 follow-up letter to the State of Michigan. “It is not enough to stand by the sidelines and merely request additional information from Enbridge given the high risk of a catastrophic oil spill in the Great Lakes that would devastate our public drinking waters and our water-dependent economy. ‘Pure Michigan’ should not just be an advertising slogan.”

For more information, visit the FLOW website at www.FLOWforWater.org

# # #

FINAL FLOW-Line 5 Media Release-Pipeline Coating 3-9-2017