Tag: mackinac straits

Liz Kirkwood’s Comment to the PSAB

  • Over two years ago, the Governor of Michigan created this Advisory Board by Executive Order to “Review and make recommendations for statutory, regulatory, and contractual implementation of the Michigan Petroleum Pipeline Task Force Report.”  This meant the board was required to oversee an independent and comprehensive analysis of risks and alternatives. 

 

  • Instead we Michiganders have (1) no risk report, (2) a flawed alternative report that still ignores the most credible alternative – using existing and expanded pipeline infrastructure around the Great Lakes, and (3) the Governor’s Thanksgiving deal with Enbridge that locks in a tunnel alternative under 20 percent of the planet’s fresh surface water. 

 

  • What our leaders have now is Tunnel Vision. 

 

  • Tens of thousands of citizens of this state have taken the time to study these matters and express their views to you.  Members of this board have spent countless hours on your task.  All of that for naught because of a closed-door agreement between Enbridge and the governor.

 

  • The deal allows Enbridge’s decaying Line 5 oil pipelines to continue to occupy the publicly owned lakebed at the Straits of Mackinac indefinitely, despite the company’s record of deception, poor stewardship, and bungled emergency response.  It’s a reward for failure.

 

  • We know a fair alternative analysis can be done.  In fact, in December 2015, FLOW offered a thorough analysis for the decommissioning of Line 5 that established an alternative that reasonably met the basic purpose of transporting crude oil to the various refineries within and beyond the Great Lakes region.  Why hasn’t the state done the same?

 

  • The Governor’s deal has mapped a blueprint that narrows the alternatives to some form of tunnel replacement in the Straits, the Great Lakes, and St. Clair River.  Moreover, the deal will bind the state to a new replacement of the entire 645 miles of Line 5 through Michigan and potentially open the door to heavy tar sands.

 

  • In the interest of full transparency and public knowledge, this board can do the people of Michigan a service by asking for a full public accounting for this deal, and by demanding a credible adverse weather provision to shut down Line 5 and a comprehensive alternatives analysis as required by law. The future of Line 5 is about the future of the Great Lakes.  And fortunately, public trust law makes this the public’s decision, not a closed-door deal between the Governor and Enbridge.     

 

Thank you.

Liz Kirkwood, Executive Director


 

For Immediate Release: FLOW RESPONDS TO STATE-ENBRIDGE AGREEMENT

FOR IMMEDIATE RELEASE                                                        November 27, 2017

Contact:  Liz Kirkwood                                                       Email: Liz@FLOWforWater.org
Executive Director                                                              Office: (231) 944-1568
FLOW (For Love of Water)                                                 Cell: (570) 872-4956


TRAVERSE CITY, MI – FLOW issued the following statement today regarding the announcement of an agreement between the state of Michigan and Enbridge Energy concerning the company’s Line 5 oil pipelines in the open waters of the Mackinac Straits, where Lake Michigan and Lake Huron meet:

“It is imprudent and arbitrary for the Governor to unilaterally sign a deal with Enbridge before the legal processes and evidence, including the opinion of experts on all sides, have been thoroughly reviewed and completed. Governor Snyder appears to have ignored and violated his own executive order, law, rules and once more ignored his public trust duties toward the Great Lakes, water, public health and safety, and the protection of citizens.”

“While the Governor’s agreement with Enbridge imposes some important interim safety measures, these measures should be steps toward the final shutdown – not replacement – of the pipelines.”

“It makes no sense to trust Enbridge to abide by a new agreement when it has been flagrantly violating its existing commitments and attempting to conceal those violations.”

“This is the same company that brought Michigan the worst inland oil spill in U.S. history and that misled both state and federal authorities for three years about its pipeline anchors causing bare metal spots on 48 locations along Line 5 in the Straits.”

“The Governor cannot preordain the tunnel option without Enbridge submitting an application under state law — the Great Lakes Submerged Lands Act — and demonstrating that there is no feasible and prudent alternative to continuing to use the Great Lakes as a high-risk shortcut for transporting oil from one part of Canada to another.”

“The presumed tunnel option bypasses and prematurely dictates the future of Line 5 and sidelines the three-year process that the Governor set into motion with the creation of the Michigan Petroleum Pipeline Task Force and the Michigan Pipeline Safety Advisory Board under his executive order.”

“The final alternatives analysis just came out on November 20 and the public comment period ends on December 22.  This agreement completely eviscerates any meaningful opportunity for the public to weigh in on alternatives.  Moreover, the public and the Governor’s office still do not have a comprehensive study analyzing the risk of Line 5 and its alternatives.”

“The Governor’s preemptive move today continues to violate treaty-reserved rights that predate Michigan’s statehood. The five federally recognized tribes whose fishing rights are located in the Straits of Mackinac were never consulted in 1953, and again were not consulted as part of this 2017 agreement between Enbridge and the State of Michigan. Sixty percent of the tribal commercial whitefish harvest comes from the spawning grounds in the Straits of Mackinac.”


FLOW (For Love of Water) is a Great Lakes water law and policy center and a 501(c)(3) nonprofit organization based in Traverse City, Michigan. Our mission is to protect the common waters of the Great Lakes Basin through public trust solutions.


Enbridge’s Neglect of 64-Year-Old “Line 5” Pipelines Risks Mackinac Straits, Requires State to Stop Oil and Hold Hearings


 


 


 

FOR IMMEDIATE RELEASE TO MEDIA: June 29, 2017

Contacts:

Liz Kirkwood, Executive Director                                                  Cell: 570-872-4956
FLOW (For Love of Water)                                                          Email: liz@flowforwater.org

Jim Olson, Founder & President                                                   Cell: 231-499-8831
FLOW (For Love of Water)                                                          Email: olson@envlaw.com 

 

TRAVERSE CITY –

After the revelation earlier this month that Enbridge for years routinely violated a legal agreement to properly anchor its dual pipelines against the swift currents in the Mackinac Straits, the state of Michigan now must apply the law, stop Line 5’s oil flow, and hold public hearings as it considers the Canadian company’s application to squeeze more life out of its decaying steel infrastructure built in 1953, according to FLOW, a Traverse City-based Great Lakes water law and policy center, in formal comments released today.

While the state’s 1953 easement agreement granting Enbridge conditional occupancy of state bottomlands in the Mackinac Straits allows Enbridge up to 90 days to cure any violations, a 2016 report commissioned by Enbridge shows that the company for years knowingly ignored the erosion problem, which  appears to be unfixable and worsening with time.

“Enbridge’s willful neglect to properly support Line 5 in the Mackinac Straits is a game changer,” said Liz Kirkwood, FLOW’s Executive Director and environmental attorney. “This neglect is a flagrant violation of the company’s privilege to use the bottomlands and waters of the Great Lakes.”

“Leaving the pipeline exposed without support in the currents and forces of the Straits causes metal fatigue and heightens the risk of a spill. There needs to be an investigation of whether a pipeline should be there at all, before considering structural changes to a pipeline that has been compromised by the company’s own actions,” Kirkwood said.

Enbridge’s June 9 “maintenance” application to install up to 22 more pipeline anchors into Lake Michigan’s public bottomlands fails to address a company pattern of violating the easement and avoiding an assessment of Line 5’s impacts and alternatives, while perpetuating the imminent threat to the Great Lakes and the protected public uses that include fishing, commerce, navigation, recreation, and drinking, according to a legal analysis by FLOW.

The Michigan Department of Environmental Quality (MDEQ) is receiving public comment through today on Enbridge’s application, which also is being reviewed by the U.S. Army Corps of Engineers.

“This application is not about anchor supports. It’s about whether Enbridge can expand Line 5 and the new Line 78 from Indiana across lower Michigan to Sarnia,” said Jim Olson, FLOW’s founder and president and a renowned water rights attorney.  “Our cities, villages, and citizens have ended up with Enbridge’s version of the Keystone XL right here in the Great Lakes, and it happened without the public notice, hearings, and independent impact and alternative analyses required by law.”

The application, like many others filed by Enbridge in the last few years, disguises the company’s piecemeal actions that continue to significantly expand oil transport through and around the Great Lakes. Line 5 transports nearly 23 million gallons of oil and natural gas liquids each day through the Mackinac Straits, 80 percent more volume than its past design capacity after several of its so-called “maintenance” upgrades.

The Michigan Pipeline Safety Advisory Board is conducting a parallel review of Line 5 in the Straits, with a draft report on alternatives released today and a risk report that has been stymied by a conflict of interest, but that process is neither under the rule of law nor complies with the Great Lakes Submerged Lands Act (GLSLA) or other state and federal law.

“The advisory board’s review is not legally binding and does not replace the DEQ’s independent obligation to determine whether Line 5 should continue.” Kirkwood said.

Of particular concern is Enbridge’s continued failure to predict and prevent the cumulative impacts on Line 5 of lakebed erosion caused by Straits currents that frequently reverse and can exceed 10 times the flow over Niagara Falls.

“Enbridge’s piecemeal approach to managing washouts and installing adequate support under the Straits crossing of Line 5 has resulted in the line frequently being out of compliance with easement support requirements since the 1970’s,” said Ed Timm, PhD, an engineer advising FLOW. “Washouts are inherently unpredictable and it is likely that damage to the pipe has already occurred because of unsupported spans that were not detected and repaired by Enbridge’s two-year inspection and repair schedule.”

Contrary to assertions by Enbridge, the state taking action to stop Line 5’s oil flow in the Mackinac Straits to prevent a catastrophic oil spill would not disrupt Michigan's or the Midwest's crude oil and propane supply, according to a set of expert reports FLOW released in December 2015. Available capacity and flexibility to meet energy demand in the Great Lakes region already exists in the North American pipeline system run not only by Enbridge, but also by competitors supplying the same refineries in Detroit, Toledo, and Sarnia, Ontario.

“The fact is, Line 5 is not essential,” said Rick Kane, a Michigan-based hazardous materials risk management specialist advising FLOW. “The regional pipeline system can supply crude oil to Michigan and surrounding refineries while eliminating the risk that Line 5 poses to the Great Lakes,” Kane said. “Feasible and prudent alternatives exist to support domestic needs, as well as exports.  However, pipeline company owners will not move to implement any alternatives as long as Line 5 operates and the public continues to carry the risk.”

For more information, visit FLOW’s website at www.FLOWforWater.org/Line-5/ and these links:

  • FLOW’s Public Comments on the Joint Application of Enbridge Energy to Occupy Great Lakes Bottomlands for Anchoring Supports to Transport Crude Oil in Line 5 Pipelines in the Straits of Mackinac and Lake Michigan [2RD-DFDK-Y35G], submitted June 29, 2017.
  • FLOW’s Public Comments on the Joint Application of Enbridge Energy to Occupy Great Lakes Bottomlands for Anchoring Supports to Transport Crude Oil in Line 5 Pipelines in The Straits of Mackinac and Lake Michigan [No. 2hb-Vgko-35je], submitted August 25, 2016.
  • Technical Note Regarding Enbridge Line 5 Non-Compliance with 1953 Easement Requirements, A Mechanistic Analysis of Straits Pipeline Washout Phenomena, by Edward E. Timm, PhD, PE, August 20, 2016.
  • Appendices of August 2016: A & B

 

Enbridge’s June 9, 2017, application and public notice can be viewed at:

  • MDEQ website at https://miwaters.deq.state.mi.us/. The public can view the application or submit comments by clicking on the Public Notice Search and entering “Enbridge” in the Applicant Name section or “2RD-DFDK-Y35G” in the Application Number section.

###

PDF of Media Release:

Read FLOW's Comments here: