Bipartisan Congressional Bill Offers Orderly Mechanism to Shut Down Line 5 Because of High Magnitude of Harm and Risks.

Line 5 Pipeline

The article linked below provides a good synopsis of the new federal bill H.R. 458 that would provide an orderly mechanism to shut down Line 5 if a 12-month study determines the risk is simply too significant to allow crude oil to flow through the heart of the Great Lakes.  The bill’s sponsors Congressmen Dave Trott (R) and Debbie Dingell (D) have launched a just approach to removing Line 5 because of its magnitude of harm and high risk.

It is important to remember that risk is not just inspections and probability. Risk (R) equals the magnitude of harm (H) multiplied by probability (P). When the magnitude of harm is high, like the devastation to the Straits, drinking water, communities, fishing, tribal interests, riparian landowners, resorts, including Mackinac Island, and all of the tourist related business, probability is less important. Under high risk management systems, the immediate action is to remove the high risk by implementing an alternative that reasonably accomplishes the overall purpose – in this case, transport of crude oil to refineries. Refineries exist in the South, Midwest, West, and East. The pipeline system in the U.S. and Canada is a mesh of pipelines to carry oil. Capacity exists within the system. In fact, they must because pipelines are shut down, and there must always be a backup plan. Given the age of the pipeline, 63 years, and the massive currents, and the high magnitude of harm, Enbridge needs to look for another way to move oil in cooperation with the overall system it manages. It doubled capacity when it replaced Line 6b, as part of the deal for devastating harm to Kalamazoo River fishery, ecosystem, and property owners. With this new line 6b with double the capacity, Enbridge does not need Line 5, it is time to shut it down. The bill, if passed, which it should be if Congress has any sense at all regarding the value of the Great Lakes and water resources in this country, should lead to the removal of Line 5, and finally the removal of the last crude oil line in Great Lakes waters. Let’s make sure no new crude oil pipelines or ships carry crude oil, including dilbit from Tar Sands, in, over, or on the Great Lakes. When there are existing routes, lots of companies, and the crude oil network runs on land where it is easier to inspect, twenty percent of the world’s fresh surface water should not be at risk. 

Read an article on the bill here by Garret Ellison,

OR

Read the text of H.R. 458 here.

 

Standing Rock win echoes across the Great Lakes

“Sunday marked a hard-earned victory for the Standing Rock Sioux tribe with the announced construction halt of the Dakota Access oil pipeline.

The protest’s main message has resonated here in Michigan and around the globe because of its core truth: oil pipelines – new and old – threaten lands and waters that are vital, not just to tribal members but to all Americans.”

FLOW’s Executive Director, Liz Kirkwood, brings the Standing Rock victory home to Michigan in this opinion piece from the Record Eagle. The time has come to defend our water.

State Must Stop Oil Flow, Hold Public Hearings on the “Line 5” Oil Pipelines in the Mackinac Straits

Photo: Bruce Trudgen Pipelaying Operation as the Pipe was Pulled across the Straits from St. Ignace

Photo: Bruce Trudgen, 1953.  Pipelaying Operation as Line 5 was pulled across the Straits from St. Ignace.

Under Michigan law, the state must stop Line 5’s oil flow and hold public hearings on the steel pipelines lying underwater in the Mackinac Straits as it considers Enbridge Energy’s application to remedy easement violations and shore up its aging underwater infrastructure, according to FLOW (For Love of Water), a Traverse City-based Great Lakes water law and policy center, in formal comments released today.

For the ninth time since 2001, Canadian energy transport giant Enbridge is seeking state permission to screw large pipeline anchors into Lake Michigan’s public bottomlands where the Straits’ powerful currents have eroded the lake bottom and left the dual Line 5 pipelines – installed in 1953 – unsupported for long stretches, in violation of the state easement agreement limiting unsupported spans to 75 feet. The Michigan Department of Environmental Quality (MDEQ) is receiving public comment through August 28, 2016, on Enbridge’s application, which also is being reviewed by the U.S. Army Corps of Engineers.

FLOW’s legal analysis concludes that Enbridge’s “maintenance” application to install up to 19 more anchors actually disguises Enbridge’s piecemeal actions that continue to significantly expand oil transport through and around the Great Lakes. In addition, the application fails to address Enbridge’s pattern of easement violations and perpetuates the imminent threat to the Great Lakes and the public’s protected uses thereof that include fishing, commerce, navigation, recreation, and drinking water. Line 5 transports nearly 23 million gallons of oil and natural gas liquids each day through the Mackinac Straits, 80 percent more volume than its past design capacity after several of its so-called “maintenance” upgrades.

“Between Line 5 and the new Line 6B, Enbridge has quietly built its own massive crude oil pipeline system here in Michigan and the Great Lakes without adequate public notice, hearings, and the legally required analysis and determinations of potential risks, impacts, and alternatives for a project of this magnitude,” said Jim Olson, FLOW’s founder and president and a renowned water rights attorney.

Given the scope and risk, the state must stop the Straits oil flow at least temporarily, hold public hearings, and examine Line 5’s full range of potential impacts to the Great Lakes ecosystem and alternatives that do not pose such harm, rather than continue to rubberstamp Enbridge’s misleading maintenance applications. The Michigan Pipeline Safety Advisory Board is conducting a parallel review of Line 5 in the Straits slated for completion in late 2017 or early 2018, but that process is neither under the rule of law nor complies with the Great Lakes Submerged Lands Act (GLSLA) or other state and federal law.

“It is time for our state’s leaders, specifically DEQ Director Grether and Attorney General Schuette, to bring this matter under the rule of law – the GLSLA and public trust law – that protects our Great Lakes, towns, and citizens, and subject Enbridge to a comprehensive review,” Olson said. “Such a review must address the fact that Line 5 is an unacceptable risk and that there exists a new Line 6B from Illinois and across Michigan that Enbridge replaced and doubled in size after its Kalamazoo River oil that will meet current and future Midwest demand.”

“Based on the evidence, it appears that Enbridge has shoved its own version of the ‘Keystone XL’ through the Great Lakes and on the backs of citizens without any review of the risks, harms, and alternatives. This is the worst place on the planet for it. We don’t need a ‘Great Lakes XL’ for crude oil near our Great Lakes or in the Straits of Mackinac, especially where alternative to Line 5 exist,” Olson said.

Of particular concern is Enbridge’s continued failure to predict and prevent the cumulative impacts on Line 5 of lakebed erosion caused by Straits currents that frequently reverse and can exceed 10 times the flow over Niagara Falls.

“Enbridge’s piecemeal approach to managing washouts and installing adequate support under the Straits crossing of Line 5 has resulted in the line frequently being out of compliance with easement support requirements since the 1970’s,” said Ed Timm, PhD, an engineer advising FLOW. “Washouts are inherently unpredictable and it is likely that damage to the pipe has already occurred because of unsupported spans that were not detected and repaired by Enbridge’s two-year inspection and repair schedule.”

While the state’s 1953 easement agreement granting Enbridge conditional occupancy of state bottomlands allows Enbridge up to 90 days to cure any violations, the erosion problem appears to be unfixable and worsening with time.

“The Achilles’ heel of the state easement agreement is that Enbridge has proven itself unable to remain in compliance and therefore frequently is operating illegally,” said Liz Kirkwood, FLOW’s Executive Director and an environmental attorney. “State law demands that the Great Lakes and their public uses must not be risked for Enbridge’s private benefit. It’s time for the state to defend the public’s rights and prevent a catastrophic oil spill into the drinking water supply for half of Michigan residents, and for a total 40 million people in the U.S. and Canada.”

Stopping Line 5’s oil flow in the Mackinac Straits to prevent a catastrophic oil spill would not disrupt Michigan’s or the Midwest’s crude oil and propane supply, contrary to assertions by Enbridge, according to a set of expert reports FLOW released in December 2015. Available capacity and flexibility to meet energy demand in the Great Lakes region already exists in the North American pipeline system run not only by Enbridge, but also by competitors supplying the same refineries in Detroit, Toledo, and Sarnia, Ontario.

“The fact is, Line 5 is not essential,” said Rick Kane, a Michigan-based hazardous materials risk management specialist advising FLOW. “The regional pipeline system can supply crude oil to Michigan and surrounding refineries while eliminating the risk that Line 5 poses to the Great Lakes,” Kane said. “Feasible and prudent alternatives exist to support domestic needs, as well as exports.  However, pipeline company owners will not move to implement any alternatives as long as Line 5 operates and the public continues to carry the risk.”

For more information, visit:

Enbridge’s application and public notice may be viewed at:

  • https://miwaters.deq.state.mi.us/. The public can view the application or submit comments by clicking on the Public Notice Search and entering “Enbridge” in the Applicant Name section.

State Has Ignored Enbridge’s Line 5 Straits Pipeline Violations

Enbridge's Line 5 pipeline during construction and installation, 1953.

Enbridge’s Line 5 pipeline during construction and installation, 1953.

 

Although Attorney General Bill Schuette and top state environmental agency directors yesterday notified Enbridge of violations of its agreement to operate oil pipelines in the Straits of Mackinac, officials only did so several months after being told by experts that powerful currents had washed away critical pipeline support infrastructure.

Schuette, Michigan Department of Environmental Quality, and Michigan Department of Natural Resources Wednesday told Enbridge it was in violation of pipeline requirements in its easement agreement with the state. But researchers documented last April cracks, dents, corrosion and structural defects in the twin Line 5 oil pipelines in the Straits.

Those concerns were raised by FLOW and other organizations in letters and meetings with state officials.  The groups say Enbridge’s easement violations are part of a pattern and practice where the Canadian transport giant avoids accountability because of infrequent pipeline inspections.

“These are known problems that fundamentally threaten our public waters and should have been addressed much sooner than this week,” said Liz Kirkwood, Executive Director of FLOW.  “Now we see some progress from the state in enforcing its agreement.

“But what we need is for the attorney general and governor to act with much more urgency and prioritize protecting the Great Lakes.  That means ending the state’s agreement that allows Enbridge to continue sending oil through the Straits.”

“Unless the attorney general and other state officials follow through, this week’s violation notice will just be window-dressing,” said Kirkwood. “The concerns are too many and too risky for the state to continue to allow oil to flow through the Straits.”

The easement agreement that is at the center of this week’s action by the state is meant to enforce safety and other conditions for operating the risky Straits oil pipelines.  Under the 1953 easement, the state must give Canadian-based Enbridge 90 days to resolve any known easement violations.

Since at least April, said Kirkwood, the state has had substantial legal and factual cause to terminate the agreement with Enbridge.  Kirkwood’s group and others sent an April 13 letter to Schuette and Snyder outlining multiple easement violations, including those cited by the state this week in its notice to Enbridge.  They also discussed these violations and federal and state law violations with top officials in the attorney general’s office.

In their April 13 letter to Schuette and Snyder, FLOW and other groups identified eight specific violations of the easement agreement and state law, including:

  • Concealing information about cracks, dents, and rust with continued, sweeping assertions and misrepresentations that the Straits pipelines are in “excellent condition, almost as new as when they were built and installed” and have “no observed corrosion.” Of the nine rust spots on the eastern Straits pipeline, corrosion has eaten away 26 percent of the pipeline’s wall thickness in a 7-inch-long area, according to newly released company data.
  • Failing to meet the pipeline wall thickness requirement due to manufacturing defects. Newly released Enbridge data reveals that manufacturing defects in the 1950s resulted in pipeline wall thickness of less than half an inch in perhaps hundreds of sections and up to 41 less thick than mandated on the west Straits pipeline. Enbridge continues to boast about its “nearly one-inch-thick walls of Line 5’s steel pipe travelling under the Straits.” 
  • Failing to meet the “reasonably prudent person” provision by claiming that its steel pipelines lying underwater just west of the Mackinac Bridge since 1953 can last forever and do not require a plan for eventual decommissioning. The 63-year-old pipelines were built to last 50 years.
  • Failing to demonstrate adequate liability insurance, maintain required coating and wood-slat covering to prevent rust and abrasion, adequately support the pipeline resulting in stressed and deformed segments, and adhere to federal spill response and state environmental protection laws, including Act 10 of P.A. 1953, the Great Lakes Submerged Lands Act (“GLSLA”), the Michigan Environmental Protection Act (“MEPA”), and public trust law.

The twin Enbridge Line 5 oil pipelines lying exposed in the Mackinac Straits, where Lake Michigan and Lake Huron meet, are a high-risk shortcut moving up to 23 million gallons of oil and propane a day primarily from western Canadian oil fields to eastern Canadian refineries, as well as on to Montreal and export markets. Research shows there are alternatives to Line 5 that do not threaten the Great Lakes, which hold 20 percent of the world’s fresh surface water.

To date, more than 60 cities, villages, townships, counties and tribal organizations across Michigan have voted to call on the governor and attorney general to stop the oil flowing through the Straits, including Mackinac Island, Mackinaw City, and the cities of Cheboygan, Petoskey, Charlevoix, and Traverse City. Dramatic new research from the University of Michigan released in late March shows an Enbridge oil pipeline rupture in the Mackinac Straits could impact more than 700 miles of Lake Michigan and Lake Huron coastlines, as well as more than 15% of Lake Michigan’s open water and nearly 60% of Lake Huron’s open water.

 

Guest Blog: Other Hidden Costs of Line 5

“You wouldn’t site, and you wouldn’t build and construct pipelines underneath the Straits today.”

Attorney General Bill Schuette

[Begging the question:  If a state-of-the-art, 21st Century pipeline presents an unacceptable risk, why is the continued use of an aging, mid-20th Century pipeline acceptable?]

Many compelling reasons exist to terminate the use of Line 5, the twin 20-inch pipelines carrying crude oil and natural gas liquids that cross the state-owned bottomlands under the Straits of Mackinac.  Much research, analysis, and modelling has been done by scientists, engineers, lawyers and academics demonstrating that Line 5 poses an unreasonable risk.  Yet Line 5 continues in use, operating under the inherent illogic that a 63 year-old undersea pipeline can function indefinitely without incident.

To the many arguments compelling closure, let me offer another – one that is decidedly minor when compared to the potential catastrophic impacts of a Line 5 failure – but an argument that might manage to nudge your outrage quotient up a notch:

You and I are subsidizing Enbridge to maintain and operate Line 5.

But before addressing the many ways public resources are being expended to benefit Enbridge, let’s review some of the facts that should have already been determinative.

  • There exists an imminent risk of catastrophic harm to one-third of North America’s surface water that is Lakes Michigan and Huron (one lake).  UM’s Graham Sustainability Institute’s analysis indicates that more than 700 miles of shoreline in Lakes Michigan and Huron and proximate islands are potentially vulnerable to an oil release in the Straits that would result in accumulation requiring cleanup, and that more than 15% of Lake Michigan’s open water (3,528 square miles), and nearly 60% of Lake Huron’s open water (13,611 square miles) could be affected by visible oil from a spill in the Straits.
  • “Imminent risk” has two components – the likelihood of a failure and the potential magnitude of the harm.  The UM study and the National Wildlife Federation report Sunken Hazard have amply demonstrated the magnitude of potential harm through dispersion modelling.  The likelihood of failure cannot be regarded as zero as Enbridge’s own inspections have revealed corrosion in nine locations, 55 “circumferential” cracks, and loss of wall thickness in the pipeline itself.
  • The U.S. Coast Guard has acknowledged its limited capacity to launch an effective remedial response should a spill event occur in winter or with waves over 4-5 feet – a common occurrence in the Straits.
  • Enbridge pipelines have had 804 document spills through 2010 with at least five additional spills since 2012.

These facts illustrate a risk of substantial harm to Lakes Michigan and Huron – a globally unique freshwater resource – as well as to the coastal communities and the tens of millions of people connected to and served by these waters.

So let’s start there – who bears the risk?

First, Enbridge has transferred the risk of harm to people of the Great Lakes Region.  The risk of harm can be quantified, modeled and monetized.  Under Enbridge’s worst-case spill scenarios of 200,000 to 400,000 gallons, Enbridge’s estimate of remedial costs approaches $1 billion.  But the FLOW (For Love of Water) policy center analysis found Enbridge’s estimate low, and has calculated a worst case spill scenario of 1.27 million gallons.  Yet under the 1953 easement, Enbridge is required to maintain a paltry $1 million in insurance and a surety bond of $100,000.

Second, additional work necessary cited by UM as a predicate to determining the full cost of the transferred risk would include an analysis of environmental impacts, cleanup costs, restoration and remediation measures, natural resource damages, and economic damage to public and private sector interests.  Natural resource damages and natural resource restoration alone costs could be many times greater than the cost of responding to a spill.  As it stands, there is no financial assurance mechanism that could begin to cover the costs of these potential impacts.

Third, the additional work necessary to ascertain the full nature and extent of damages that may occur with a Line 5 failure has been left to taxpayers.  Already, significant resources have been expended in an effort to understand the risks presented by Line 5.  In Michigan, these costs include the work of the Department of Attorney General and its lawyers, the staff of the Michigan Department of Environmental Quality, the Michigan Department of Natural Resources, the Michigan Public Service Commissions, and local governments who have mobilized in response to the Line 5 threat.  It includes the staff and support for the Michigan Petroleum Pipeline Task Force.  Also include all the staff time of the myriad state and federal agency personnel who have spent thousands of hours attending to the various aspects of Line 5 matters.

Fourth, taxpayers have paid for the spill response exercises undertaken by state and federal officials.  We have paid for the multiple mobilizations of the United States Coast Guard, the Pipeline and Hazardous Materials Safety Administration, the Environmental Protection Agency, the Michigan State Police, and Mackinac County Emergency Management. NOAA’s Great Lakes Environmental Research Laboratory (GLERL) and GLERL’s Lake Michigan Field Station have also been involved in spill response exercises.

Fifth, aside from a $2,450 payment made to the Michigan Department of Conservation in 1953, the state is not receiving any compensation for the use of state bottomlands.  Great Lakes bottomlands are “public trust” resources meaning that under our jurisprudence, the state holds the bottomlands in trust for the benefit of the people of the State of Michigan.  When state bottomlands are leased for uses like a marina or dockage, compensation is paid for that use.  But more importantly, under the “Public Trust Doctrine,” the state may not lease bottomlands unless it first makes a determination that future uses of state bottomlands will not be impaired or substantially affected.

Here’s what the MDEQ website states about the Public Trust Doctrine:

“The bottomlands of the Great Lakes are held in trust by the State of Michigan for use and enjoyment by its citizens. The State, as the owner and trustee, has a perpetual responsibility to the public to manage these bottomlands and waters for the prevention of pollution, for the protection of the natural resources and to maintain the public’s rights of hunting, fishing, navigation, commerce, etc. The State of Michigan’s authority to protect the public’s interest in the bottomlands and waters of the Great Lakes is based on both ownership and state regulation. The Public Trust Doctrine, as the basis for Part 325, provides state authority to not only manage but also to protect the public’s fundamental rights to use these resources.

Michigan courts have determined that private uses of the bottomlands and waters, including the riparian rights of waterfront property owners, are subject to the public trust. In other words, if a proposed private use would adversely impact the public trust, the State of Michigan’s regulatory authority requires that the proposal be modified or denied altogether in order to minimize those impacts.”

Another critical aspect of the Public Trust Doctrine is that the doctrine requires reexamination of past governmental decisions on public trust matters in light of new scientific knowledge and information.  Attorney General Schuette has stated that based upon what we know today, a pipeline crossing the Straits is unacceptable.  Under the Public Trust Doctrine, he should be compelled to act to terminate Line 5.

The Traverse City-based FLOW policy center has been an international champion of the Public Trust Doctrine and recently persuaded the international Joint Commission to recognize the doctrine as a managing framework for the Great Lakes.  FLOW has also taken the lead in doing much of the legal and engineering assessments of Line 5 – earning widespread gratitude, respect and support.

*reposted from 5 Lakes Energy’s July 27, 2016 Energy and Climate Notes

Enbridge Downplaying the Potential Size of Catastrophic “Line 5” Straits Oil Spill

 

In the last two years, Enbridge has cut nearly in half its estimate of the likely size of an oil spill from a pair of aging pipelines that move nearly 23 million gallons of oil a day through the Mackinac Straits, while independent studies suggest the risk is much greater and growing. Read the full findings by engineer and FLOW technical expert Gary Street. 

President of WTCM Radio and FLOW Board Member Ross Biederman Speaks Out Against Line 5

Ross Biederman, owner of Midwest Broadcasting, issued a broadcast and print editorial today urging our political leaders and those running for office to  help shut down the flow of crude oil through Line 5 in the Straits.  Biederman warns it is too dangerous, the harm too devastating, and the risk too high to continue operating Line 5 in the Straits of Mackinac.  In a no nonsense, strong voice, he concludes oil in the Straits pipeline should be eliminated, there are alternatives for the crude synthetic lighter oil to get there and to satisfy the smaller needs of a refinery in Michigan, and most of the oil goes to Canada anyway, and that citizens should take action by demanding that their leaders take charge and act on this issue.  Read print copy of Ross’s broadcast below and listen to the radio spot here.

 

Transcript of Biederman Editorial

If you think the Flint water crises was Catastrophe that could have been avoided by the state of Michigan imagine an oil spill in the Straits of Mackinac. Lurking beneath the water at the straits lies a 4 ½ mile long pipeline carrying about 500,000 barrels or 23 million gallons of liquid petroleum…crude…each day. The pipeline is owned by a Canadian company, Enbridge. It’s referred to as Line 5 and it carries crude from Superior, Wisconsin to Sarnia, Ontario. Line 5 is 63 years old and has never been thoroughly inspected by The State of Michigan. Here are just two potential problem areas. The welding techniques used in 1953 are out-dated. Also, the pipeline is covered in zebra mussels making comprehensive visual inspection difficult if not impossible.

Michigan’s Attorney General has the authority to order Line 5 shut down, but has not done so. He has ordered more studies which could take up to a year and a half. You have the power to do something! Bills have been introduced in both Michigan’s House and Senate that would accomplish this. They haven’t gone to committee yet and probably will not before the Legislatures’ Summer Recess. What can you do? Tell your State Representative and Senator to get off the dime and move this legislation. An oil spill at the Straits could foul both Lake Michigan and Huron because of the currents. Imagine it happening during the winter under the ice. The University of Michigan said the Mackinac Straits would be the worst possible place for an oil spill. I should mention that is was an Enbridge pipeline failure that dumped 840,000 gallons of crude into the Kalamazoo River in 2010…the largest inland spill in US history.

So make your voice be heard to end this potential danger to our ecology and economy. This is an election year. Every state representative is up for re-election as is half the Senate.

And by the way, it isn’t like we’d be cutting off our supply of oil. Enbridge has built a new pipeline…Line 6…that’s has twice the capacity. Line 6 runs through Wisconsin, around Chicago, and across Southern Michigan to Sarnia.

Michigan only gets 10-12% of the crude anyway….the rest goes to Canada.

With election nearing, now is the time to demand that candidates pledge to take action closing Line 5!

Great Lakes Lawyers & Scientists Urge Gov. Snyder & AG Schuette: Imminent Hazard Requires Immediate Actions to Eliminate Oil Risk in Straits of Mackinac

Filling a void left by the state, a Great Lakes law and policy group and its scientific advisors released a report today calling on the Snyder administration to take interim steps – including the immediate temporary halt of oil flowing through two aging pipelines in the Mackinac Straits – and swiftly pursue an “action plan” to prevent an oil spill that likely could not be cleaned up and would threaten the state and regional economy, a vital fishery, and the drinking water supply for Mackinac Island and St. Ignace.

“The Michigan Task Force and Attorney General Schuette have determined that the magnitude of harm from a release of oil in the Straits is unacceptable, and that the days of these aging pipelines for transport of oil are limited,” said Jim Olson, a Traverse City attorney and President of FLOW.  “According to FLOW’s scientific experts, the transport of oil under the Straits is an imminent hazard that is at the highest level risk. Based on standard hazardous management practices, this means that interim measures that significantly lower the risk must be immediately implemented.  This also requires an immediate independent evaluation of alternative pipeline routes, capacity and logistics to eliminate the high risk of serious harm.  Until this evaluation is done, the reasonable and prudent thing to do is to halt the transport of crude oil under the Straits.”

“An effective oil spill response and recovery is virtually impossible, particularly in winter months when the Straits are covered with four feet of ice,” said Liz Kirkwood, FLOW’s Executive Director.  “According to our scientists, shutting off the flow of oil under the Straits won’t interfere with natural gas liquids, such as propane used for home heating, because they do not pose the same risk to the Straits and would continue to flow to residents in the Upper and northern Lower Peninsulas.”

The 33-page report on the Enbridge “Line 5” pipelines points to new findings, including the pipeline company’s own admission that tens of thousands of gallons of oil a day could leak into the Mackinac Straits undetected, to conclude that an “imminent harm” to the Great Lakes exists and must be stopped. The report also finds that at least one of the Straits pipelines is dented despite Enbridge’s reassurances otherwise and that the wooden slats meant to surround and protect the outside of the pipelines are missing.

“Analysis of these issues, as documented by several reports, now leads me to the conclusion that Line 5 is far more likely to present an imminent threat to health and property than not,” said Ed Timm, PhD., PE, a former senior scientist and consultant to Dow Chemical’s Environmental Operations Business and member of the FLOW expert team.  “Immediate action should be taken to assure the safety of Line 5 while the legal deliberations go on.”

The report released by FLOW, an independent nonprofit organization that evaluates Great Lakes scientific and policy issues, is intended to fill and strengthen the gap left by a state task force report issued in July that made important recommendations for assessing the risk and seeking alternatives to the Enbridge oil pipelines, but lacked action steps and a timetable. The FLOW report charts a course with clear actions to the Snyder administration and Attorney General Schuette who are charged with the responsibility of implementing the state task force recommendations and protecting the Mackinac Straits and Great Lakes from any release of oil with serious and catastrophic consequences.

The FLOW report concludes that the current use of Line 5 for the transport of crude oil “poses a high level of risk and imminent high magnitude of harm,” and proposes a specific action plan to eliminate the harm, including to:

  1. Promptly conduct an independent expert alternatives assessment regarding transport of crude oil in Line 5 through the Straits segment, as called for by the state task force;
  2. Convene and complete immediately an independent risk analysis based on credible, worst-case scenarios;
  3. Require adequate financial assurances and an approved emergency response plan by independent qualified experts that conform to the level of risk and worst-case scenarios;
  4. Require immediate submission of additional verifiable information from Enbridge and other qualified and independent sources.
  5. Take immediate enforcement actions against Enbridge to address any material violations of the state-granted 1953 easement allowing Enbridge to occupy state bottomlands in the Straits.
  6. Exercise the full authority under our constitution and laws, including common law and the public trust, that eliminate or prevent the failure of Line 5 under the Straits.

Built in 1953 during the Eisenhower administration, the aging Enbridge pipelines push nearly 23 million gallons of oil and natural gas liquids a day through the Mackinac Straits, which the company uses as a shortcut for its Line 5 route from Superior, Wis., to Sarnia, Ontario. Canadian-based Enbridge is infamous for its Line 6B pipeline that corroded and spilled 1 million gallons of heavy tar sands oil in 2010 into the Kalamazoo River watershed near Marshall, Michigan.

Enbridge estimates that a “worst-case” spill from Line 5 in winter would dump up to 360,000 gallons of oil in the Mackinac Straits and would cost as much as $900 million to clean up, not including any damages to persons, property, or natural resources for which Enbridge is liable, nor for any fines or penalties. A U.S. Environmental Protection Agency on-site oil cleanup coordinator said in March 2015 that in good conditions, no more than half of the oil spilled in open water is ever recovered. The U.S. Coast Guard Commandant in April testified to Congress that he is “not comfortable” with the current contingency plans for a worst‐case spill in the Great Lakes.

In the report, FLOW’s science and technical advisors reached several key findings, including that Enbridge’s own documents filed with the state show that 140,000 gallons of oil per day can leak into the Great Lakes at the Mackinac Straits from Enbridge’s aging Line 5 oil pipelines without Enbridge detecting it or triggering its “automatic” shutoff valves because of the technological limits of its equipment.

“A permanent solution – eliminating the Line 5 Straits crossing – may take time, but short-term action to immediately reduce the risk should be undertaken.” said Rick Kane, a hazardous materials risk-management specialist and member of the FLOW expert team. “The Line 5 crossing is a high risk due to the severe consequences of a leak and probability that a leak could occur from a number of causes, including a large failure or a smaller failure that would leak over a number of days or weeks below the system detection threshold, potentially releasing thousands of gallons per day, unknown to operators.”

The experts also found, similar to the findings underlying a recent formal notice sent by the National Wildlife Federation to the federal Department of Transportation, that Enbridge has never been required to do, and has never done, a competent emergency response plan based on a full and worst-case scenario of a rupture or release of crude oil in the Straits. In addition, Enbridge lacks sufficient capacity at the local level to respond, particularly in the winter when a response or clean up could not be done.  The expert team also found that there is a lack of sufficient structural supports and wooden slat covers to protect Line 5 under the Straits, exposing the pipeline to currents, abrasion, and other failures.

As Long as Oil Flows through the Straits Pipelines, the Great Lakes Remain at Unacceptable Risk

The Great Lakes are no safer from an oil pipeline spill today despite yesterday’s release of the State of Michigan Pipeline Task Force’s 80-page report and recommendations.

The Task Force report included four recommendations directed at Enbridge’s twin 62-year-old petroleum pipelines located on the bottom of the Straits of Mackinac: (1) Ban transportation of heavy crude oil through the Straits pipelines; (2) Require an independent risk analysis and full insurance coverage for the pipelines; (3) Require an independent analysis of alternatives to the existing pipelines; (4) Obtain more inspection data from Enbridge relating to the pipelines.

Yet, oil still flows through Line 5.  The Task Force rejected shutting down Line 5 while gathering additional information on the basis that they had “inadequate information at this time to fully evaluate the risks presented by the Straits Pipelines.” (P. 57)

Impose Emergency Measures Immediately

At a minimum, however, the Task Force should impose immediate emergency measures on the pipeline given (1) potential violations of the 1953 Easement related to Enbridge’s inability to demonstrate that it has adequate liability coverage to cover all damages from an oil spill; (2) the Coast Guard’s admission that it is inadequately prepared to clean up an open water spill in freshwater let alone under frozen winter conditions; (3) Enbridge’s failure to disclose inspection, maintenance, and repair records to document internal and external corrosion rates under the Straits and inherent limitations related to inline inspection tools.

The question remains: how much more information do we need to unveil before our trustee – the State – takes swift protective action that prioritizes the paramount interests of citizens over private corporations?

The Task Force and the public have rejected the idea that the Straits Pipelines can last indefinitely.  In fact, the Attorney General Bill Schuette has declared that “the days of letting two controversial oil pipelines operate under the Straits of Mackinac are numbered.”  This is hopeful news, but every day counts, and until we have specific measures in place that prevent a catastrophic spill, the State of Michigan is placing the Great Lakes at risk.