Thousands urge MPSC to bring Enbridge under rule of law to protect Great Lakes
By Emma Moulton, FLOW Milliken Intern for Communications
During a three-week comment period that ended in mid-May, the Michigan Public Service Commission (MPSC) received a flood of more than 3,100 public comments, with a strong majority firmly opposed, on Enbridge’s request to bypass the legal review process and plow forward with other permitting required to replace and relocate the decaying Line 5 oil pipelines crossing the Straits of Mackinac with a proposed 18- to 21-foot diameter tunnel housing a new pipeline.
MPSC spokesman Matt Helms called the volume of comments “definitely a high amount” even for an agency whose utility rate-setting cases sometimes draw intense public scrutiny. The submissions poured in from individuals, families, tribes, environmental groups, elected officials, business owners, political groups, and many others opposed to the Canadian company’s attempted legal maneuver.
Many comments, including from FLOW, highlighted deep concerns over due process, the rule of law, and tribal treaty rights in response to Enbridge’s request for a declaratory ruling that no approval from the MPSC is even necessary. The Canadian pipeline company justifies its request by claiming that a new, roughly 4-mile long tunnel through the bedrock and loose soil of the public trust bottomlands should be considered mere “maintenance” on the old Line 5 pipelines in the open waters that the MPSC approved 67 years ago.
It’s 2020, Not 1953, and A Momentous Decision Awaits
An overarching theme of the comments was that this is no longer 1953, when Dwight Eisenhower was president and color TV was new to America. Now climate change, water scarcity, privatization, and oil spills must be taken into account when considering this massive, new fossil-fuel infrastructure. The public comments demand that MPSC’s decision be based on actual necessity in light of societal clean-energy goals and public interest in a sustainable future. Line 5 only grows more dangerous with age, and it is decision time for Michigan’s leaders.
“There’s no free pass here,” said Jim Olson, FLOW founder and legal advisor. “The MPSC is charged with the responsibility of assuring this project is necessary and in the public interest of the people of Michigan in 2020, not 1953. The world has changed and with the current COVID-19 pandemic and global climate crisis, the MPSC’s decision will be momentous.”
Groups Point to Risks, Legal Tactics, Lack of Public Necessity
In their comments, many environmental groups spoke to the unacceptable risk a tunnel would pose to natural resources in Michigan. Several submissions cited the major catastrophe that would be unleashed by an oil spill under and gushing into the Great Lakes, including the damage to drinking water supplies, public health, jobs and the economy, public and private property, aquatic life and habitat, current and future generations, and a way of life in the Great Lakes State.
And the groups directly addressed the criteria the MPSC considers in weighing Enbridge’s request for a declaratory ruling. The Sierra Club, for instance, insisted that the MPSC deny Enbridge’s request, as it, “asks the Commission to ignore that its proposal is in fact to replace the dual Line 5 pipelines by building a new single pipeline, of a different size, in a new location”—noting that Sierra Club members from Michigan rely on the Great Lakes for their clean water and their livelihoods.
The citizen-led Straits of Mackinac Alliance questioned the necessity of the tunnel given the economic downturn here and beyond, writing, “Any projection of tunnel use beyond the next decade is highly speculative” due to Michigan’s change in oil demand. “Michigan’s need for oil products in 2020 is totally different than it was in 1953… Current demands for oil have dropped dramatically and industry projections for shale oil sources do not look promising. The shale oil producers may not be in business when the tunnel project is completed.”
On behalf of multiple groups and tribes, including the Michigan Environmental Council, the Grand Traverse Band of Ottawa and Chippewa Indians, Tip Of The Mitt Watershed Council, and National Wildlife Federation, attorney Christopher Bzdok highlighted Enbridge’s thin reasoning in support of its request for a declaratory ruling and noted that the MPSC “reserved jurisdiction and authority over Line 5, and the right to issue subsequent orders as the Commission deemed necessary. That reservation gives the Commission ample authority to require a new approval for the project and a new contested case.”
Tribes Voice Concerns over Treaty Rights and Survival
Throughout the comments, there is a powerful presence of tribal organizations voicing their critical position on the request, most often citing the 1836 Treaty of Washington, which preceded Michigan’s statehood in 1837 reserved the tribes’ rights to hunt, fish, and gather throughout the territory, and asserted the need for an environment in which fish can thrive.
In addressing tribal rights, attorney Bzdok highlights the lack of tribal collaboration in the MPSC’s original 1953 decision on Line 5: “The Tribes – at least two of which will be intervening in this case – were the original occupants of the property that will be occupied by the project. They retain certain reserved rights to natural resources in the project area under the Treaty of Washington.”
On behalf of the Little Traverse Bay Bands of Odawa Indians, Tribal Chairperson Regina Gasco-Bentley states that the reserved treaty rights “remain central to our culture, economy, and physical and spiritual well-being. The Straits of Mackinac are the life blood of our Tribe. An oil spill or geologic mishap from tunneling under the Straits would devastate our Tribe beyond any economic valuation.”
Next Steps from the MPSC on a Line 5 Oil Tunnel
The MPSC through May 27 accepted any replies on the public comment that was submitted by the May 13 deadline. The public body expects to decide on Enbridge’s request for a declaratory ruling at a June or July meeting, or shortly after, according to spokesman Helms.
If the MPSC rightly rejects the request, then, according to FLOW’s Jim Olson, the MPSC in its review of Enbridge’s April 17 tunnel application should “fully consider and determine the effect on, and potential impairment to, the substantial risks, alternatives, costs, and damages, and the future of the State of Michigan under the public trust in the Great Lakes, environment, fishing, fishery habitat, and the communities, including tribal interests under long-standing treaties” of Enbridge’s tunnel pipeline proposal under the Straits of Mackinac to replace its existing four-mile Line 5 pipeline on the lakebed.
hoping they make the right decison! Shut it down and protect the Great Lakes! We cannot afford an Exxon Valdez, and Enbridge doesnt care! Profit, over environment.
Shut Down Line Five…..
Before it leaks.