By Gary Street,
Chemical Engineer & FLOW Consultant
What if the two twenty inch diameter pipelines that cross the Straits (part of Enbridge Line 5) were hung from the Mackinac Bridge, rather than immersed in water in nearly 300 feet deep? The engineers on the staff at FLOW took a look at the concept. Is it possible? Does it make the situation less environmentally hazardous? What impact will it have on the Bridge? Was the Bridge designed for the extra load?
So we did some calculations.
The result: In addition to the regular car and truck traffic, for which the Bridge was designed, the pipelines would put the added weight of an additional 2000 to 3500 automobiles onto the Bridge. And not just for a short time, but continuously, 24 hours a day, 365 days per year.
Almost certainly the Bridge was not designed for all this extra weight. And what if the lines were to rupture? The oil still goes into the Straits.
Clearly, not a good idea!